• Zinc Conc. TC 50%min CIF Chinadown(-5)  11-26|Yttrium Oxide 99.999%min In warehouse Rotterdamup(5)  11-26|Yttrium Oxide 99.999%min FOB Chinaup(0.5)  11-26|Erbium Oxide 99.5%min In warehouse Rotterdamup(2)  11-26|Terbium Oxide 99.99%min In Warehouse Rotterdamup(120)  11-26|Zinc Conc. 50%min EXW Chinaup(500)  11-26|Antimony Ingot 99.65%min In warehouse Rotterdamdown(-1100)  11-26|Spodumene Li2O 6%min CIF Chinaup(30)  11-26|Gadolinium Oxide 99.99%min In Warehouse Baltimoreup(5)  11-26|Dysprosium Oxide 99.5%min In Warehouse Rotterdamup(25)  11-26|Neodymium Metal 99%min FOB Chinadown(-2.5)  11-26|Lithium Carbonate 99.2%min Delivered Chinaup(2000)  11-26|Lithium Carbonate 99.5%min Delivered Chinaup(2000)  11-26|Silicon Metal 98.5%min Delivered USdown(-0.03)  11-26
  • Tangshan holds air pollution prevention and control measures deployment meeting for Sep

    2019-09-03 16:40:56   [Print]
    On the afternoon of September 1st, Tangshan held a meeting on the intensified air pollution control measures deployment for September, and made arrangements to continuously reduce the city's comprehensive air quality index and PM2.Asian Metal Copyright5 average concentration, increase the number of fine weather days, and continuously improve the ranking of air quality.Asian Metal Copyright5 average concentration, increase the number of fine weather days, and continuously improve the ranking of air quality.

    Vice Mayor Li Guifu attended the meeting and stressed all departments at all levels should ensure that the governance of industrial enterprises would be completed on schedule to produce emission reduction benefits in the autumn and winter. Besides, environmental protection, industrial kiln and boiler management in key industries must be completed on schedule.

    .Asian Metal Copyright Besides, environmental protection, industrial kiln and boiler management in key industries must be completed on scheduleAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.