• Lead Conc. Pb 50%min, Ag 1,000g/dt max EXW China TCdown(-100)  09-24|Iron Ore Fine Australian 58%min In port Chinadown(-20)  09-24|Iron Ore Fine 65%min Ex-VAT EXW Shanxidown(-20)  09-24|Iron Ore Fine Australian 62%min In port Chinadown(-20)  09-24|Cobalt Sulfate 20.5%min Delivered Chinadown(-1500)  09-24|Coal Tar Pitch Coking Value 56%min EXW Chinadown(-200)  09-24|Chromic Anhydride 99.8%min EXW Chinaup(500)  09-24|Spodumene Li2O 3%min In port Chinadown(-50)  09-24|Iron Ore Fine 65%min EXW Liaoningdown(-20)  09-24|HR Coil IS2062 3.0mm IW Mumbaiup(1500)  09-24|Spodumene Li2O 6%min CIF Chinadown(-50)  09-24|Lithium Manganate Mn 58% Delivered Chinadown(-1000)  09-24|Iron Ore Lump Australian 62%min In port Chinadown(-20)  09-24|Iron Ore Fine Brazilian 65%min In port Chinadown(-20)  09-24
  • Echeng Iron & Steel demolishes converters of 35t

    2019-09-03 17:20:11   [Print]
    On August 27, the iron and steel capacity transfer project of Echeng Iron & Steel (Echeng Steel) under Baowu launched a ceremony to demolish its converters of 35t, which is one of the major moves for Echeng Steel to transform, upgrade and promote green development.

    According to the previous announcement, WISCO Echeng Iron & Steel Co., Ltd.Asian Metal Copyright .Asian Metal Copyright plans to remove the existing two converters of 35t and steel-making capacity of 1.Asian Metal Copyright, Ltd.Asian Metal Copyright1 million tons and receive the steel-making capacity of 260,000t transferred by Baowu Group Shanghai Baosteel Co.Asian Metal Copyright plans to remove the existing two converters of 35t and steel-making capacity of 1.Asian Metal Copyright, Ltd.Asian Metal Copyright Based on the principle of amount-reducing transfer, Echeng Steel plans to build a converter of 120t and steel-making capacity of 1.Asian Metal Copyright, involving a capacity quota of 1.Asian Metal Copyright Based on the principle of amount-reducing transfer, Echeng Steel plans to build a converter of 120t and steel-making capacity of 1.Asian Metal Copyright36 million tons for transfer.Asian Metal Copyright, Ltd.Asian Metal Copyright Based on the principle of amount-reducing transfer, Echeng Steel plans to build a converter of 120t and steel-making capacity of 1.Asian Metal Copyright1 million tons and receive the steel-making capacity of 260,000t transferred by Baowu Group Shanghai Baosteel Co.Asian Metal Copyright35 million tons in the current plant.
    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.