• Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(3)  11-14|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdamup(0.03)  11-14|Ferro-molybdenum 60%min Delivered Indiadown(-80)  11-14|Antimony Ingot 99.65%min EXW Chinaup(4000)  11-14|Sodium Pyroantimonate 58.4% Delivered Chinaup(2000)  11-14|Coal Tar Pitch Coking Value 56%min EXW Chinaup(100)  11-14|Ferro-molybdenum 60%min In warehouse Russiadown(-80)  11-14|Antimony Ingot 99.85%min EXW Chinaup(4000)  11-14|Erbium Oxide 99.5%min FOB Chinaup(1.5)  11-14|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  11-14|Calcined Pet Coke S 3%max EXW Chinadown(-100)  11-14|Coking Coal A 10.5%max, S 0.8%max EXW Shanxiup(40)  11-14|Antimony Conc. 50%min Delivered Chinaup(3000)  11-14|Antimony Trioxide 99.5%min Delivered Chinaup(3000)  11-14
  • All steel mills unable to finish ultra-low emission renovation shall suspend for rectification by late October in Jiangsu

    2019-08-27 17:20:33   [Print]
    In order to reverse the disadvantageous situation of the aggravation of ozone pollution, Jiangsu's districts and municipalities have launched a three-month special action on ozone pollution prevention and control.Asian Metal Copyright At the same time, all coal-fired boilers with 35 steam tons per hour or less are "cleared" during the year; all coal-fired boilers with 65 steam tons per hour or more shall completed energy saving and ultra-low emission renovation, and other coal-fired boilers shall implement special emission limits.Asian Metal Copyright For the iron and steel industry, Jiangsu stipulates that the transformation of the whole process ultra-low emission of iron and steel enterprises should be completed by the end of October in all regions.Asian Metal Copyright If the renovation is not completed within the time limit, production shall be stopped and rectification shall be carried out.Asian Metal Copyright If the renovation is not completed within the time limit, production shall be stopped and rectification shall be carried out.Asian Metal Copyright If the renovation is not completed within the time limit, production shall be stopped and rectification shall be carried out.Asian Metal Copyright At the same time, all coal-fired boilers with 35 steam tons per hour or less are "cleared" during the year; all coal-fired boilers with 65 steam tons per hour or more shall completed energy saving and ultra-low emission renovation, and other coal-fired boilers shall implement special emission limits.

    .Asian Metal Copyright At the same time, all coal-fired boilers with 35 steam tons per hour or less are "cleared" during the year; all coal-fired boilers with 65 steam tons per hour or more shall completed energy saving and ultra-low emission renovation, and other coal-fired boilers shall implement special emission limitsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.