• Yttrium Oxide 99.999%min In warehouse Rotterdamup(28.5)  12-03|Yttrium Oxide 99.999%min FOB Chinaup(1.3)  12-03|Prebaked Anode S 3%max FOB Chinadown(-30)  12-03|Ammonium Metavanadate 98%min EXW Chinaup(2000)  12-03|Caustic Soda 32%min Delivered Chinadown(-80)  12-03|Dysprosium Oxide 99.5%min In Warehouse Rotterdamup(30)  12-03|Yttrium Metal 99.9%min FOB Chinaup(0.9)  12-03|Tungsten APT 88.5%min In warehouse Rotterdamup(20)  12-03|Vanadium Pentoxide Powder 99.5%min EXW Chinaup(2500)  12-03|LNCMO 613 PC Delivered Chinadown(-4)  12-03|Cobalt Intermediate 30-40% CIF Chinaup(0.6)  12-03|LNCMO 523 PC Delivered Chinadown(-4)  12-03|Ilmenite Conc 46%min Ex-VAT EXW Chinadown(-50)  12-03|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  12-03
  • All steel mills unable to finish ultra-low emission renovation shall suspend for rectification by late October in Jiangsu

    2019-08-27 17:20:33   [Print]
    In order to reverse the disadvantageous situation of the aggravation of ozone pollution, Jiangsu's districts and municipalities have launched a three-month special action on ozone pollution prevention and control.Asian Metal Copyright At the same time, all coal-fired boilers with 35 steam tons per hour or less are "cleared" during the year; all coal-fired boilers with 65 steam tons per hour or more shall completed energy saving and ultra-low emission renovation, and other coal-fired boilers shall implement special emission limits.Asian Metal Copyright For the iron and steel industry, Jiangsu stipulates that the transformation of the whole process ultra-low emission of iron and steel enterprises should be completed by the end of October in all regions.Asian Metal Copyright For the iron and steel industry, Jiangsu stipulates that the transformation of the whole process ultra-low emission of iron and steel enterprises should be completed by the end of October in all regions.Asian Metal Copyright If the renovation is not completed within the time limit, production shall be stopped and rectification shall be carried out.Asian Metal Copyright If the renovation is not completed within the time limit, production shall be stopped and rectification shall be carried out.Asian Metal Copyright At the same time, all coal-fired boilers with 35 steam tons per hour or less are "cleared" during the year; all coal-fired boilers with 65 steam tons per hour or more shall completed energy saving and ultra-low emission renovation, and other coal-fired boilers shall implement special emission limits.

    .Asian Metal Copyright For the iron and steel industry, Jiangsu stipulates that the transformation of the whole process ultra-low emission of iron and steel enterprises should be completed by the end of October in all regionsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.