• NdFeB Sintered Rough N35 Block EXW Chinaup(4)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinaup(0.3)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreaup(0.3)  11-21|Ferro-vanadium 80%min In warehouse Pittsburghdown(-0.9)  11-21|Spodumene Li2O 3%min In port Chinaup(30)  11-21|Ferro-chrome Indian Cr 58%min, C 8%max CIF Chinadown(-0.03)  11-21|Cobalt Intermediate 30-40% CIF Chinaup(0.6)  11-21|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurup(60)  11-21|Lithium Manganate Mn 58% Delivered Chinaup(900)  11-21|Spodumene Li2O 6%min CIF Chinaup(30)  11-21|Lithium Iron Phosphate Li 3.9%min Delivered Chinadown(-1000)  11-21|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  11-21|Rebar HRB400 20mm In warehouse Guangzhouup(80)  11-21|Samarium Cobalt 30H EXW Chinaup(7)  11-21
  • All steel mills unable to finish ultra-low emission renovation shall suspend for rectification by late October in Jiangsu

    2019-08-27 17:20:33   [Print]
    In order to reverse the disadvantageous situation of the aggravation of ozone pollution, Jiangsu's districts and municipalities have launched a three-month special action on ozone pollution prevention and control.Asian Metal Copyright At the same time, all coal-fired boilers with 35 steam tons per hour or less are "cleared" during the year; all coal-fired boilers with 65 steam tons per hour or more shall completed energy saving and ultra-low emission renovation, and other coal-fired boilers shall implement special emission limits.Asian Metal Copyright For the iron and steel industry, Jiangsu stipulates that the transformation of the whole process ultra-low emission of iron and steel enterprises should be completed by the end of October in all regions.Asian Metal Copyright For the iron and steel industry, Jiangsu stipulates that the transformation of the whole process ultra-low emission of iron and steel enterprises should be completed by the end of October in all regions.Asian Metal Copyright If the renovation is not completed within the time limit, production shall be stopped and rectification shall be carried out.Asian Metal Copyright If the renovation is not completed within the time limit, production shall be stopped and rectification shall be carried out.Asian Metal Copyright At the same time, all coal-fired boilers with 35 steam tons per hour or less are "cleared" during the year; all coal-fired boilers with 65 steam tons per hour or more shall completed energy saving and ultra-low emission renovation, and other coal-fired boilers shall implement special emission limits.

    .Asian Metal Copyright If the renovation is not completed within the time limit, production shall be stopped and rectification shall be carried outAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.