• Ferro-molybdenum 65%min In warehouse USup(2.2)  02-09|Spodumene Li2O 6%min CIF Chinadown(-60)  02-09|Bastnaesite TREO 70%min EXW Chinaup(1300)  02-09|Cobalt Metal 99.8%min Delivered Chinaup(12)  02-09|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(22000)  02-09|Ferro-vanadium 50%min In warehouse Russiaup(28)  02-09|Vanadium Pentoxide Powder 99.5%min EXW Chinaup(2800)  02-09|Spodumene Li2O 3%min In port Chinadown(-60)  02-09|NdFeB Sintered Rough N35 Block EXW Chinaup(5)  02-09|Ferro-molybdenum 60%min In port South Koreaup(1.7)  02-09|Ferro-molybdenum 65%min In warehouse Rotterdamup(1.7)  02-09|Neodymium Oxide 99.5%min EXW Chinaup(23000)  02-09|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinadown(-13)  02-09|Praseodymium Oxide 99.5%min EXW Chinaup(23000)  02-09
  • Ansteel supplies 1,200t of HRC plate to China-Laos Railway Project

    2019-08-16 16:22:30   [Print]
    According to Ansteel, the company won the bids of China-Laos Railway Project and has started to supply the 1,200t of HRC plate.Asian Metal Copyright The products should arrive at Jinzhou Port in Liaoning before August 15, meaning limited time.Asian Metal Copyright This marks that Ansteel adds power again to the construction of China-Laos railway, which is the key project of the Belt and Road Initiative.

    The products should arrive at Jinzhou Port in Liaoning before August 15, meaning limited time. Besides, chrome should be added into the products and the products should be plates.Asian Metal Copyright Besides, chrome should be added into the products and the products should be plates.Asian Metal Copyright When related officials of Marketing and Sales Center of Ansteel got the order, they coordinated all departments to organize the production and ensure the time and quality.
    .Asian Metal Copyright The products should arrive at Jinzhou Port in Liaoning before August 15, meaning limited timeAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.