• NCM 523 Delivered Chinaup(2900)  10-28|NCM 613 Delivered Chinaup(2700)  10-28|Terbium Oxide 99.99%min EXW Chinadown(-200)  10-28|Erbium Oxide 99.5%min FOB Chinaup(1.5)  10-28|Cobalt Carbonate 46%min Delivered Chinaup(5000)  10-28|Gadolinium Oxide 99.99%min In Warehouse Baltimoreup(5)  10-28|Cobalt Metal 99.8%min In warehouse Rotterdamup(0.6)  10-28|Lithium Cobaltate Co 60%min Delivered Chinaup(10)  10-28|Cobalt Oxide 72%min In warehouse Rotterdamup(0.9)  10-28|NCM 8312 Delivered Chinaup(3000)  10-28|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  10-28|Cobalt Metal 99.8%min In warehouse Baltimoreup(0.6)  10-28|Sodium Pyroantimonate 58.4% Delivered Chinadown(-2000)  10-28|Coal Tar Pitch Coking Value 56%min EXW Chinadown(-100)  10-28
  • Japanese steel mills to hike crude steel output to 16.04 million tons in Q3 (Jul to Sep)

    2019-08-14 18:11:04   [Print]
    According to the latest investigation conducted by Ministry of Economy, Trade and Industry of Japan, Japanese steel mills plan to hike the output of crude steel to 16.Asian Metal Copyright "Supported by other construction projects, demand wouldn't drop dramatically," the source added.Asian Metal Copyright04 million tons in Q3 (Jul to Sep), up by 1.Asian Metal Copyright7% YOY and down by 8% compared with the previous quarter.Asian Metal Copyright5% YOY but slightly down by 0.Asian Metal Copyright5% YOY but slightly down by 0.Asian Metal Copyright3% compared with the previous quarter (Apr to Jun).

    A dealer in Tokyo attributed the YOY growth to natural disasters in Q3 2018 (Jul to Sep) and noted, "Steel mills record higher output compared with the same period of last year but suffer a slight decline compared with the previous quarter, because steel inventory still stand high in Japan."

    Another dealer in Tokyo stated, although domestic demand is expected to remain strong, demand from construction industry may touch the ceiling as major projects of 2020 Tokyo Olympics have been completed. "Supported by other construction projects, demand wouldn't drop dramatically," the source added.

    In Q3 2019 (Jul to Sep), the output of finished steel in Japanese market is expected to be RMB14.46 million tons, down by 2.Asian Metal Copyright46 million tons, down by 2.Asian Metal Copyright7% YOY and down by 5.Asian Metal Copyright .Asian Metal Copyright3% compared with the previous quarter; the exports are expected to be 7.Asian Metal Copyright In Q3 2019 Jul to Sep, the output of finished steel in Japanese market is expected to be RMB14.Asian Metal Copyright75 million tons, up by 7.Asian Metal CopyrightAccording to the latest investigation conducted by Ministry of Economy, Trade and Industry of Japan, Japanese steel mills plan to hike the output of crude steel to 16.Asian Metal Copyright8% YOY and up by 10.Asian Metal Copyright3% YOY and down by 1% compared with the previous quarter; the production plan for small-sized steel is 1.Asian Metal Copyright8% compared with the previous quarter.

    The production plan for H-beam steel is 940,000 tons, down by 3.3% YOY and down by 1% compared with the previous quarter; the production plan for small-sized steel is 1.Asian Metal Copyright8% compared with the previous quarter.Asian Metal Copyright99 million tons, down by 4.Asian Metal Copyright3% YOY and down by 1% compared with the previous quarter; the production plan for small-sized steel is 1.Asian Metal Copyright7% YOY and down by 8% compared with the previous quarter.

    .Asian Metal Copyright99 million tons, down by 4Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.