• Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinadown(-15)  09-18|Calcined Pet Coke S 3%max EXW Chinaup(100)  09-18|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.4)  09-18|Tungsten APT 88.5%min In warehouse Rotterdamup(15)  09-18|Tungsten APT 88.5%min FOB Chinaup(15)  09-18|Bismuth Ingot 99.99%min EXW Chinaup(3000)  09-18|Ferro-tungsten 75%min In warehouse Rotterdamup(2)  09-18|Bismuth Oxide 99.9%min EXW Chinaup(3000)  09-18|Germanium Metal 99.99%min Delivered Europeup(100)  09-18|Germanium Metal 99.99%min Delivered USup(100)  09-18|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurdown(-50)  09-18|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurdown(-50)  09-18
  • Japanese steel mills to hike crude steel output to 16.04 million tons in Q3 (Jul to Sep)

    2019-08-14 18:11:04   [Print]
    According to the latest investigation conducted by Ministry of Economy, Trade and Industry of Japan, Japanese steel mills plan to hike the output of crude steel to 16.Asian Metal Copyright8% YOY and up by 10.Asian Metal Copyright04 million tons in Q3 (Jul to Sep), up by 1.Asian Metal Copyright75 million tons, up by 7.Asian Metal Copyright5% YOY but slightly down by 0.Asian Metal Copyright8% compared with the previous quarter.Asian Metal Copyright3% compared with the previous quarter (Apr to Jun).

    A dealer in Tokyo attributed the YOY growth to natural disasters in Q3 2018 (Jul to Sep) and noted, "Steel mills record higher output compared with the same period of last year but suffer a slight decline compared with the previous quarter, because steel inventory still stand high in Japan."

    Another dealer in Tokyo stated, although domestic demand is expected to remain strong, demand from construction industry may touch the ceiling as major projects of 2020 Tokyo Olympics have been completed. "Supported by other construction projects, demand wouldn't drop dramatically," the source added.

    In Q3 2019 (Jul to Sep), the output of finished steel in Japanese market is expected to be RMB14.46 million tons, down by 2.Asian Metal Copyright75 million tons, up by 7.Asian Metal Copyright7% YOY and down by 5.Asian Metal Copyright .Asian Metal Copyright3% compared with the previous quarter; the exports are expected to be 7.Asian Metal Copyright" Another dealer in Tokyo stated, although domestic demand is expected to remain strong, demand from construction industry may touch the ceiling as major projects of 2020 Tokyo Olympics have been completed.Asian Metal Copyright75 million tons, up by 7.Asian Metal Copyright "Supported by other construction projects, demand wouldn't drop dramatically," the source added.Asian Metal Copyright8% YOY and up by 10.Asian Metal Copyright .Asian Metal Copyright8% compared with the previous quarter.

    The production plan for H-beam steel is 940,000 tons, down by 3.3% YOY and down by 1% compared with the previous quarter; the production plan for small-sized steel is 1.Asian Metal Copyright7% YOY and down by 8% compared with the previous quarter.Asian Metal Copyright99 million tons, down by 4.Asian Metal Copyright3% compared with the previous quarter Apr to Jun.Asian Metal Copyright7% YOY and down by 8% compared with the previous quarter.

    .Asian Metal Copyright" Another dealer in Tokyo stated, although domestic demand is expected to remain strong, demand from construction industry may touch the ceiling as major projects of 2020 Tokyo Olympics have been completedAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.