• Yttrium Oxide 99.999%min In warehouse Rotterdamup(25)  12-05|Zinc Conc. TC 50%min CIF Chinadown(-5)  12-05|Selenium Dioxide 98%min Delivered Chinadown(-4)  12-05|Antimony Trioxide 99.5%min In warehouse Baltimoredown(-0.8)  12-05|Calcined Pet Coke S 3%max EXW Chinaup(100)  12-05|Antimony Ingot 99.65%min In warehouse Baltimoredown(-0.7)  12-05|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1)  12-05|Rebar HRB400 20mm In warehouse Shanghaiup(80)  12-05|Yttrium Oxide 99.999%min FOB Chinaup(0.5)  12-05|Manganese Ore Brazilian 44%min In Tianjin Portup(1)  12-05|Manganese Ore Gabonese 44%min In Tianjin Portup(1)  12-05|Manganese Ore Australian 45%min In Tianjin Portup(1)  12-05|Antimony Ingot 99.65%min In port Indiadown(-100)  12-05|Ferro-vanadium 50%min In warehouse Russiaup(20)  12-05
  • Nyrstar restarts Port Pirie lead smelter

    2019-08-01 15:17:21   [Print]
    Nyrstar said that it has restarted production at its Port Pirie lead smelter in Australia.

    The smelter suspended production on May 28 due to an unplanned outage at the blast furnace.

    A spokesman confirmed that operations at Port Pirie have resumed with both the TSL furnace and blast furnace now operating normally.

    Nyrstar, owned by trading house Trafigura, lost 30,000t of lead metal due to the outage, the company said on July 19.

    Port Pirie produced 160,000 t of lead metal last year, down by 7% from the previous year.

    .Asian Metal CopyrightNyrstar said that it has restarted production at its Port Pirie lead smelter in AustraliaAsian Metal Copyright
    Lead Ingot 99.994%min EXW China
    Unit:RMB/mt
    Lead Ingot 99.994%min EXW China RMB/mt
    China primary lead producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.