• Ferro-tungsten 70%min EXW Chinaup(25000)  02-02|Lithium Carbonate 99.2%min Delivered Chinadown(-4500)  02-02|Aluminum Alloy Ingot A356.2 Delivered Chinadown(-730)  02-02|Zinc Ingot 99.995%min In warehouse Guangzhoudown(-770)  02-02|Zinc Ingot 99.995%min In warehouse Tianjindown(-770)  02-02|Aluminum Ingot 99.7%min In warehouse Gongyidown(-730)  02-02|Zinc Ingot 99.995%min In warehouse Shanghaidown(-770)  02-02|Aluminum Ingot 99.7%min In warehouse Foshandown(-730)  02-02|Aluminum Ingot 99.7%min In warehouse Wuxidown(-730)  02-02|Ferro-tungsten 75%min EXW Chinaup(25000)  02-02|Lithium Carbonate 99.5%min Delivered Chinadown(-4500)  02-02|Cobalt Metal 99.8%min Delivered Chinadown(-13)  02-02|Zinc Die-casting Alloy Zamak-3 EXW Chinadown(-770)  02-02|Copper Cathode 99.99%min Delivered Chinadown(-3000)  02-02
  • Nyrstar restarts Port Pirie lead smelter

    2019-08-01 15:17:21   [Print]
    Nyrstar said that it has restarted production at its Port Pirie lead smelter in Australia.

    The smelter suspended production on May 28 due to an unplanned outage at the blast furnace.

    A spokesman confirmed that operations at Port Pirie have resumed with both the TSL furnace and blast furnace now operating normally.

    Nyrstar, owned by trading house Trafigura, lost 30,000t of lead metal due to the outage, the company said on July 19.

    Port Pirie produced 160,000 t of lead metal last year, down by 7% from the previous year.

    .Asian Metal Copyright The smelter suspended production on May 28 due to an unplanned outage at the blast furnaceAsian Metal Copyright
    Lead Ingot 99.994%min EXW China
    Unit:RMB/mt
    Lead Ingot 99.994%min EXW China RMB/mt
    China primary lead producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.