• Titanium Slag TiO2 90%min EXW Chinadown(-200)  07-15|Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered Chinadown(-400)  07-15|Rhenium APR 99.99%min EXW Chinaup(250)  07-15|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  07-15|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(80)  07-15|Cobalt Chloride 24%min Delivered Chinaup(1500)  07-15|Polysilicon 9N Delivered Chinaup(1)  07-15|Titanium Tetrachloride 99.99%min EXW Chinadown(-150)  07-15|Fluorspar 97%min Delivered Chinadown(-80)  07-15|Cobalt Carbonate 46%min Delivered Chinaup(3000)  07-15|Silicon Metal 97%min EXW Chinaup(200)  07-15|Titanium Dioxide R TiO2 93%min FOB Chinadown(-50)  07-15|Copper Conc. TC 25%min CIF Chinadown(-1)  07-15|Fused Alumina Brown 95%min 1-3mm In warehouse Rotterdamdown(-20)  07-15
  • Sierte's Mawei Mountain Pyrite goes into operation

    2019-07-02 17:17:00   [Print]
    Anhui Sierte Fertilizer Industry Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright In addition, the mining of the pyrite associated ores, zinc, lead, copper and silver in Mawei Mountain will gradually improve the company's profitability.Asian Metal Copyright announced on 28 June that it has acquired the Safety Production Permit and Mining Permit of China, which indicated that its Mawei Mountain Pyrite in Xuanzhou, Xuancheng went into operation formally.Asian Metal Copyright announced on 28 June that it has acquired the Safety Production Permit and Mining Permit of China, which indicated that its Mawei Mountain Pyrite in Xuanzhou, Xuancheng went into operation formally.Asian Metal Copyright The annual production capacity of the Pyrite is 380,000t and the deposit area is 0.Asian Metal Copyright The annual production capacity of the Pyrite is 380,000t and the deposit area is 0.Asian Metal Copyright5175km2.

    According to the company, pyrite is one of its main raw materials. After the project is put into production successfully, the company could reduce its purchase volume of pyrite, and the operation of three sulfuric acid production lines would be further ensured.Asian Metal Copyright After the project is put into production successfully, the company could reduce its purchase volume of pyrite, and the operation of three sulfuric acid production lines would be further ensured.Asian Metal Copyright As a result, the company's production costs will decrease.Asian Metal Copyright, Ltd.Asian Metal Copyright In addition, the mining of the pyrite associated ores, zinc, lead, copper and silver in Mawei Mountain will gradually improve the company's profitability.

    .Asian Metal CopyrightAnhui Sierte Fertilizer Industry CoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.