• Titanium Slag TiO2 90%min EXW Chinadown(-200)  07-15|Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered Chinadown(-400)  07-15|Rhenium APR 99.99%min EXW Chinaup(250)  07-15|Cobalt Tetroxide 73.5%min Delivered Chinaup(5)  07-15|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(80)  07-15|Cobalt Chloride 24%min Delivered Chinaup(1500)  07-15|Polysilicon 9N Delivered Chinaup(1)  07-15|Titanium Tetrachloride 99.99%min EXW Chinadown(-150)  07-15|Fluorspar 97%min Delivered Chinadown(-80)  07-15|Cobalt Carbonate 46%min Delivered Chinaup(3000)  07-15|Silicon Metal 97%min EXW Chinaup(200)  07-15|Titanium Dioxide R TiO2 93%min FOB Chinadown(-50)  07-15|Copper Conc. TC 25%min CIF Chinadown(-1)  07-15|Fused Alumina Brown 95%min 1-3mm In warehouse Rotterdamdown(-20)  07-15
  • Baosteel Desheng to start new steelmaking (step one) project

    2019-06-04 17:55:41   [Print]
    On May 31, China MCC17 Group Co.Asian Metal Copyright The new steelmaking step one project of Baosteel Desheng is a continuation of the steelmaking project of Shanghai No.Asian Metal Copyright, LTD.Asian Metal Copyright443 million tons of high quality steel and 1.Asian Metal Copyright succeeded in winning the bid for the new steelmaking (step one) project of Baosteel Desheng Stainless Steel Co.Asian Metal Copyright, LTD.Asian Metal Copyright, Ltd.

    The second steelmaking project of Baosteel Desheng is implemented in two steps. In the first step, one high quality steel production line and two 400 series stainless steel production lines are set up in the steelmaking workshop, with the planned annual output of 1.Asian Metal Copyright443 million tons of high quality steel and 1.Asian Metal Copyright443 million tons of high quality steel and 1.Asian Metal Copyright In the first step, one high quality steel production line and two 400 series stainless steel production lines are set up in the steelmaking workshop, with the planned annual output of 1.Asian Metal Copyright354 million tons of 400 series stainless steel.

    The new steelmaking (step one) project of Baosteel Desheng is a continuation of the steelmaking project of Shanghai No. 1 Steel's stainless steel steelmaking project and one of the projects of Baosteel Desheng to build a green industrial base for high quality stainless steel.


    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.