• Antimony Conc. 50%min Delivered Chinaup(10000)  11-19|Antimony Trioxide 99.8%min Delivered Chinaup(10000)  11-19|Antimony Ingot 99.65%min EXW Chinaup(10000)  11-19|Antimony Ingot 99.85%min EXW Chinaup(10000)  11-19|Zinc Conc. TC 50%min CIF Chinadown(-5)  11-19|Sodium Pyroantimonate 58.4% Delivered Chinaup(3000)  11-19|Spodumene Li2O 6%min CIF Chinaup(30)  11-19|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  11-19|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdamup(0.03)  11-19|Spodumene Li2O 3%min In port Chinaup(25)  11-19|NCM 8312 Delivered Chinadown(-3000)  11-19|Spodumene Li2O 5%min In port Chinaup(30)  11-19|Antimony Ingot 99.65%min In warehouse Rotterdamdown(-1000)  11-19|Ferro-tungsten 75%min In warehouse Rotterdamup(2)  11-19
  • Energy Bureau approves three coal mine projects

    2019-06-04 17:35:19   [Print]
    The State Energy Administration issued a notice on May 31, approving three coal mine projects, including Beixinyao Coal Mine Project and Lingbei Coal Mine Project in Shanxi, and Songxinzhuang Coal Mine Project in Ningxia.Asian Metal Copyright, with a total investment of RMB5.Asian Metal Copyright The three coal mine projects are all coal capacity replacement projects with a combined annual capacity of 7.Asian Metal Copyright Beixinyao Coal Mine Project, located in Ningwu County, Xinzhou City, Shanxi Province, is undertaken by Datong Coal Mine Group Co.Asian Metal Copyright6 million tons.

    Beixinyao Coal Mine Project, located in Ningwu County, Xinzhou City, Shanxi Province, is undertaken by Datong Coal Mine Group Co., Ltd.Asian Metal Copyright6 million tons.Asian Metal Copyright, with a total investment of RMB5.Asian Metal Copyright333 billion USD772.Asian Metal Copyright333 billion (USD772.Asian Metal Copyright, with a total investment of RMB5.Asian Metal Copyright14 million) (excluding mining rights expenses).Asian Metal Copyright84 million excluding mining rights expenses.Asian Metal Copyright The capacity of the mine is 4 million tons per year, and a coal preparation plant with an annual capacity of 10 million tons will also be built.

    Lingbei Coal Mine Project, located in Lingshi County, Jinzhong City, Shanxi Province, is in the charge of Shanxi Fenxi Mining (Group) Co., Ltd.Asian Metal Copyright045 billion USD440.Asian Metal Copyright, with a total investment of RMB3.Asian Metal Copyright, with a total investment of RMB5.Asian Metal Copyright045 billion (USD440.Asian Metal Copyright14 million excluding mining rights expenses.Asian Metal Copyright84 million) (excluding mining rights expenses).Asian Metal Copyright2 million tons per year, and the coal preparation plant with the same capacity will also be built.Asian Metal Copyright The capacity of Lingbei Coal Mine is 2.Asian Metal Copyright045 billion USD440.Asian Metal Copyright4 million tons per year, and a coal preparation plant with the same capacity will also be constructed.

    Songxinzhuang Coal Mine Project is located in Yanchi County, Wuzhong City, Ningxia Hui Autonomous Region, with a total investment of RMB1.64 billion (USD237.Asian Metal Copyright The three coal mine projects are all coal capacity replacement projects with a combined annual capacity of 7.Asian Metal Copyright43 million) (excluding mining rights).Asian Metal Copyright, Ltd.Asian Metal Copyright Sinopec Great Wall Energy and Chemical (Ningxia) Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright is responsible for the project.Asian Metal Copyright, with a total investment of RMB5.Asian Metal Copyright The capacity of the mine is 1.Asian Metal Copyright The three coal mine projects are all coal capacity replacement projects with a combined annual capacity of 7.Asian Metal Copyright2 million tons per year, and the coal preparation plant with the same capacity will also be built.

    .Asian Metal Copyright6 million tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.