• Ferro-manganese Mn 65%min, C 7%max EXW Chinaup(150)  08-31|Ilmenite Conc 46%min Ex-VAT EXW Chinadown(-40)  08-31|Strontium Metal 99%min EXW Chinaup(2500)  08-31|Strontium Metal 99%min FOB Chinaup(350)  08-31|Ferro-manganese Mn 75%min, C 8%max EXW Chinaup(150)  08-31|Ilmenite Conc 52%min CIF Chinadown(-5)  08-31|Flake Graphite -195 FOB Africaup(10)  08-31|Ilmenite Conc 50%min EXW Chinadown(-30)  08-31|Ilmenite Conc 50%min In port Chinadown(-30)  08-31|Ferro-manganese Mn 75%min, C 2%max EXW Chinaup(150)  08-31|Lithium Manganate Mn 58% Delivered Chinaup(1000)  08-31|Antimony Ingot 99.65%min FOB Chinadown(-500)  08-31|Ferro-manganese Mn 78%min, C 1.5%max EXW Chinaup(150)  08-31|Silico-manganese 60/14 EXW Chinaup(100)  08-31
  • KISC to relocate for transformation

    2019-05-23 18:30:35   [Print]
    KISC held a ceremony for environmental protection relocation project on 21 May in Caopu new area of KISC.Asian Metal Copyright The project includes one pellet production line of 2.Asian Metal Copyright The project and suppotive rails are expected to be invested with RMB12 billion with construction period of two years.Asian Metal Copyright .Asian Metal Copyright The project includes one pellet production line of 2.Asian Metal Copyright6 million tons, one sintering machine of 450m2, one blast furnace of 2,500m3, two converters of 120t and refining and casting systems.Asian Metal Copyright6 million tons, one sintering machine of 450m2, one blast furnace of 2,500m3, two converters of 120t and refining and casting systems.Asian Metal Copyright4 million tons of steel and annual sales income of more than RMB20 billion with tax of more than RMB2 billion.Asian Metal Copyright The stock yard would be expanded with a 950,000tpy rolling mill production line, an 800,000tpy aluminum rod line, a 550,000tpy high-speed wire line and a 450,000tpy high-speed wire line.Asian Metal CopyrightKISC held a ceremony for environmental protection relocation project on 21 May in Caopu new area of KISC.Asian Metal Copyright The area would see an annual production capacity of 5.Asian Metal Copyright The project and suppotive rails are expected to be invested with RMB12 billion with construction period of two years.Asian Metal Copyright4 million tons of steel and annual sales income of more than RMB20 billion with tax of more than RMB2 billion.
    .Asian Metal Copyright The project includes one pellet production line of 2Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.