• Copper Cathode 99.99%min Delivered Chinadown(-3140)  02-05|Tungsten Ore WO3 50%min FOB Africaup(30)  02-05|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(300)  02-05|Copper Conc. 20%min Delivered Chinadown(-3000)  02-05|Ferro-vanadium 80%min In warehouse Pittsburghup(0.9)  02-05|Spodumene Li2O 6%min CIF Chinadown(-60)  02-05|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(35)  02-05|Lanthanum Oxide 99.999%min EXW Chinaup(800)  02-05|Lithium Carbonate 99.2%min Delivered Chinadown(-4000)  02-05|Ferro-tungsten 75%min EXW Chinaup(25000)  02-05|Spodumene Li2O 3%min In port Chinadown(-60)  02-05|Bismuth Ingot 99.99%min Delivered Indiaup(50)  02-05|Cobalt Metal 99.8%min Delivered Chinadown(-12)  02-05|Tantalum Metal 99.95%min EXW Chinaup(100)  02-05
  • Jianlong Group: to realize steel development target of Heilongjiang in three years

    2019-02-20 16:26:16   [Print]
    Zhang Zhixiang, the Chairman of Jianlong Group, noted during the meeting on 2018 work summary and 2019 work motivation held on January 2019 that they will realize the target made by Heilongjiang government, namely realizing annual steel production capacity of 10 million tons and annual production value of RMB100 billion in three years.Asian Metal CopyrightZhang Zhixiang, the Chairman of Jianlong Group, noted during the meeting on 2018 work summary and 2019 work motivation held on January 2019 that they will realize the target made by Heilongjiang government, namely realizing annual steel production capacity of 10 million tons and annual production value of RMB100 billion in three years.Asian Metal Copyright In particular, Jianlong Xilin Iron & Steel Co.Asian Metal CopyrightZhang Zhixiang, the Chairman of Jianlong Group, noted during the meeting on 2018 work summary and 2019 work motivation held on January 2019 that they will realize the target made by Heilongjiang government, namely realizing annual steel production capacity of 10 million tons and annual production value of RMB100 billion in three years.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright is required to achievement the target of annual production capacity of 5 million tons of steel by the end of 2020.
    .Asian Metal Copyright is required to achievement the target of annual production capacity of 5 million tons of steel by the end of 2020Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.