• Tungsten Ore WO3 55%min EXW Chinaup(15000)  01-19|Tungsten APT 88.5%min In warehouse Rotterdamup(30)  01-19|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinaup(34)  01-19|Tungsten Ore WO3 65%min EXW Chinaup(15000)  01-19|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(35)  01-19|Tungsten Bar W-4 99.9%min EXW Chinaup(35)  01-19|Ferro-tungsten 75%min In warehouse Rotterdamup(4)  01-19|Lithium Carbonate 99.2%min Delivered Chinadown(-4600)  01-19|Lithium Carbonate 99.5%min Delivered Chinadown(-4600)  01-19|Cobalt Metal 99.8%min Delivered Chinadown(-13)  01-19|Ferro-tungsten 75%min EXW Chinaup(20000)  01-19|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(5)  01-19|Tungsten APT 88.5%min EXW Chinaup(20000)  01-19|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  01-19
  • Hebei shuts down all iron and steel zombie companies in 2018

    2019-01-07 17:58:26   [Print]
    Since early 2018, Hebei has been resolutely eliminating outdated capacity, with new progress seen in the supply-side structural reform.

    In 2018, Hebei began the transition from quantity-oriented capacity elimination to structure-oriented capacity elimination. In the year, Hebei eliminated steel smelting capacity of 12.Asian Metal Copyright01 million tons, thermal power capacity of 549,500KW, with all zombie companies shut down, overfulfilling the annual target.Asian Metal Copyright299 million tons, iron smelting capacity of 10.Asian Metal Copyright299 million tons, iron smelting capacity of 10.Asian Metal Copyright87 million tons, coal capacity of 14.Asian Metal Copyright In 2018, Hebei began the transition from quantity-oriented capacity elimination to structure-oriented capacity elimination.Asian Metal Copyright01 million tons, thermal power capacity of 549,500KW, with all zombie companies shut down, overfulfilling the annual target.

    .Asian Metal Copyright In the year, Hebei eliminated steel smelting capacity of 12Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.