• Yttrium Oxide 99.999%min In warehouse Rotterdamup(20)  12-01|Yttrium Oxide 99.999%min FOB Chinaup(1.4)  12-01|Zinc Conc. TC 50%min CIF Chinadown(-5)  12-01|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(20000)  12-01|Zinc Conc. 50%min EXW Chinaup(540)  12-01|NCM 8312 Delivered Chinadown(-3400)  12-01|Tin Conc. Burmese 20%min In warehouse MengAup(8000)  12-01|Prebaked Anode S 3%max EXW Chinaup(150)  12-01|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(20000)  12-01|Neodymium Oxide 99.5%min EXW Chinaup(17000)  12-01|Tin Conc. Burmese 30%min In warehouse MengAup(8000)  12-01|Spodumene Li2O 5%min In port Chinaup(40)  12-01|Praseodymium Oxide 99.5%min EXW Chinaup(17000)  12-01|Neodymium Metal 99%min EXW Chinaup(20000)  12-01
  • Tangshan to carry out staggering peak production in autumn and winter

    2018-09-20 13:46:36   [Print]
    On 19 September, Tangshan municipal government formally released the notice on key industry autumn and winter differentiated staggering peak production performance appraisal comments, effective from 1 October, 2018 to 31 March, 2019.Asian Metal Copyright .Asian Metal Copyright As required by the program, companies should carry out differentiated staggering peak production based on levels granted by adhering to the principles of focusing on quality, implementing separately, acting according to circumstance, carrying out staggering peak production and contingency plan of heavy pollution.

    The evaluation index consists of general ones and differentiated ones. The main differentiated indexes of iron & steel industry are emission standards, external transportation structure and additional value of products.Asian Metal Copyright The main differentiated indexes of iron steel industry are emission standards, external transportation structure and additional value of products.Asian Metal Copyright Iron & steel companies are classified into four categories, including those don't need to carry out staggering peak production in autumn and winter, those need to carry out staggering peak production of 30% in autumn and winter (according to production capacity of blast furnaces), those need to carry out staggering peak production of 50% in autumn and winter and those need to carry out staggering peak production of 70% in autumn and winter with sintering process halting production.

    .Asian Metal Copyright Iron steel companies are classified into four categories, including those don't need to carry out staggering peak production in autumn and winter, those need to carry out staggering peak production of 30% in autumn and winter according to production capacity of blast furnaces, those need to carry out staggering peak production of 50% in autumn and winter and those need to carry out staggering peak production of 70% in autumn and winter with sintering process halting productionAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.