• Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(3)  11-14|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdamup(0.03)  11-14|Ferro-molybdenum 60%min Delivered Indiadown(-80)  11-14|Antimony Ingot 99.65%min EXW Chinaup(4000)  11-14|Sodium Pyroantimonate 58.4% Delivered Chinaup(2000)  11-14|Coal Tar Pitch Coking Value 56%min EXW Chinaup(100)  11-14|Ferro-molybdenum 60%min In warehouse Russiadown(-80)  11-14|Antimony Ingot 99.85%min EXW Chinaup(4000)  11-14|Erbium Oxide 99.5%min FOB Chinaup(1.5)  11-14|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  11-14|Calcined Pet Coke S 3%max EXW Chinadown(-100)  11-14|Coking Coal A 10.5%max, S 0.8%max EXW Shanxiup(40)  11-14|Antimony Conc. 50%min Delivered Chinaup(3000)  11-14|Antimony Trioxide 99.5%min Delivered Chinaup(3000)  11-14
  • Jiangsu accelerates upgrading of chemical, steel, coal and power industries

    2018-09-06 15:51:33   [Print]
    Jiangsu province issued suggestions on accelerating provincial upgrading of chemical, steel, coal and power industries for high-quality development, which includes elimination of ineffective supply and low-end capacity, active expansion of excellent supply and new power capacity.Asian Metal Copyright According to the suggestions, the installment scale of coal-fired power generation projects in Jiangsu will be controlled within 80 million kilowatts by 2020 and the share of coal-fired power generation projects will decline from 67.Asian Metal Copyright According to the suggestions, the installment scale of coal-fired power generation projects in Jiangsu will be controlled within 80 million kilowatts by 2020 and the share of coal-fired power generation projects will decline from 67.Asian Metal Copyright5% at the same time; 1,000 chemical companies, which can't meet environmental requirements and are of high risks of safety, as well as all unqualified industrial parks will be closed in next three years; crude steel capacity will be controlled within 115 million tons.Asian Metal Copyright6% to 58.Asian Metal Copyright According to the suggestions, the installment scale of coal-fired power generation projects in Jiangsu will be controlled within 80 million kilowatts by 2020 and the share of coal-fired power generation projects will decline from 67.Asian Metal Copyright5% at the same time; 1,000 chemical companies, which can't meet environmental requirements and are of high risks of safety, as well as all unqualified industrial parks will be closed in next three years; crude steel capacity will be controlled within 115 million tons.
    .Asian Metal Copyright According to the suggestions, the installment scale of coal-fired power generation projects in Jiangsu will be controlled within 80 million kilowatts by 2020 and the share of coal-fired power generation projects will decline from 67Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.