• Neodymium Metal 99%min EXW Chinaup(25000)  01-26|Lithium Metal 99.9%min Delivered Chinaup(29000)  01-26|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(20000)  01-26|Neodymium Oxide 99.5%min EXW Chinaup(20000)  01-26|Praseodymium Oxide 99.5%min EXW Chinaup(20000)  01-26|Iron Ore Fine 65%min EXW Shandongdown(-30)  01-26|Lithium Metal 99%min Delivered Chinaup(27000)  01-26|Vanadium Pentoxide Flake 98%min In warehouse Rotterdamup(0.15)  01-26|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(4500)  01-26|Tin Conc. Burmese 20%min In warehouse MengAup(11000)  01-26|Lithium Manganate Mn 58% Delivered Chinaup(1500)  01-26|Lithium Iron Phosphate Li 3.9%min Delivered Chinaup(1700)  01-26|Tin Conc. Burmese 30%min In warehouse MengAup(11000)  01-26|Spodumene Li2O 3%min In port Chinaup(60)  01-26
  • Jiangsu accelerates upgrading of chemical, steel, coal and power industries

    2018-09-06 15:51:33   [Print]
    Jiangsu province issued suggestions on accelerating provincial upgrading of chemical, steel, coal and power industries for high-quality development, which includes elimination of ineffective supply and low-end capacity, active expansion of excellent supply and new power capacity.Asian Metal Copyright According to the suggestions, the installment scale of coal-fired power generation projects in Jiangsu will be controlled within 80 million kilowatts by 2020 and the share of coal-fired power generation projects will decline from 67.Asian Metal Copyright According to the suggestions, the installment scale of coal-fired power generation projects in Jiangsu will be controlled within 80 million kilowatts by 2020 and the share of coal-fired power generation projects will decline from 67.Asian Metal Copyright5% at the same time; 1,000 chemical companies, which can't meet environmental requirements and are of high risks of safety, as well as all unqualified industrial parks will be closed in next three years; crude steel capacity will be controlled within 115 million tons.Asian Metal Copyright6% to 58.Asian Metal Copyright According to the suggestions, the installment scale of coal-fired power generation projects in Jiangsu will be controlled within 80 million kilowatts by 2020 and the share of coal-fired power generation projects will decline from 67.Asian Metal Copyright5% at the same time; 1,000 chemical companies, which can't meet environmental requirements and are of high risks of safety, as well as all unqualified industrial parks will be closed in next three years; crude steel capacity will be controlled within 115 million tons.
    .Asian Metal Copyright5% at the same time; 1,000 chemical companies, which can't meet environmental requirements and are of high risks of safety, as well as all unqualified industrial parks will be closed in next three years; crude steel capacity will be controlled within 115 million tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.