• NdFeB Sintered Rough N35 Block EXW Chinaup(4)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinaup(0.3)  11-21|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreaup(0.3)  11-21|Ferro-vanadium 80%min In warehouse Pittsburghdown(-0.9)  11-21|Spodumene Li2O 3%min In port Chinaup(30)  11-21|Ferro-chrome Indian Cr 58%min, C 8%max CIF Chinadown(-0.03)  11-21|Cobalt Intermediate 30-40% CIF Chinaup(0.6)  11-21|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurup(60)  11-21|Lithium Manganate Mn 58% Delivered Chinaup(900)  11-21|Spodumene Li2O 6%min CIF Chinaup(30)  11-21|Lithium Iron Phosphate Li 3.9%min Delivered Chinadown(-1000)  11-21|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(20)  11-21|Rebar HRB400 20mm In warehouse Guangzhouup(80)  11-21|Samarium Cobalt 30H EXW Chinaup(7)  11-21
  • Shenzhen Seg's thin fim PV project settled in Shanshen Specail Cooperation Zone

    2018-01-11 18:07:13   [Print]
    On January 8th, Shenzhen Seg Longyan Photovoltaic Industry Garden held the foundation stone laying ceremony in Shanshen Specail Cooperation. By then, the CdTe Film PV Industry Base Project prepared by Shenzhen Seg for more than 1 year was finally settled in the Shanshen Specail Cooperation Zone

    It is known that Saige Longyan Thin Film PV Industry Garden was invested and constructed by Shenzhen Seg, Longyan Energy Technology (Hangzhou) Co., Ltd.Asian Metal CopyrightOn January 8th, Shenzhen Seg Longyan Photovoltaic Industry Garden held the foundation stone laying ceremony in Shanshen Specail Cooperation.Asian Metal Copyright and Shenzhen Energy Nanjing Holding Company.Asian Metal Copyright By then, the CdTe Film PV Industry Base Project prepared by Shenzhen Seg for more than 1 year was finally settled in the Shanshen Specail Cooperation Zone It is known that Saige Longyan Thin Film PV Industry Garden was invested and constructed by Shenzhen Seg, Longyan Energy Technology Hangzhou Co.Asian Metal Copyright Constructed based on the layout of headquarter in Shenzhen and bases in Shenshan Specail Cooperation Zone, the project will include 2 production lines with an annual capacity of 40MW of CdTe thin film solar battery module and is expected to be completed construction and put into operation gradually within 15 months.
    .Asian Metal CopyrightOn January 8th, Shenzhen Seg Longyan Photovoltaic Industry Garden held the foundation stone laying ceremony in Shanshen Specail CooperationAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.