• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • Shenzhen Seg's thin fim PV project settled in Shanshen Specail Cooperation Zone

    2018-01-11 18:07:13   [Print]
    On January 8th, Shenzhen Seg Longyan Photovoltaic Industry Garden held the foundation stone laying ceremony in Shanshen Specail Cooperation. By then, the CdTe Film PV Industry Base Project prepared by Shenzhen Seg for more than 1 year was finally settled in the Shanshen Specail Cooperation Zone

    It is known that Saige Longyan Thin Film PV Industry Garden was invested and constructed by Shenzhen Seg, Longyan Energy Technology (Hangzhou) Co., Ltd.Asian Metal Copyright By then, the CdTe Film PV Industry Base Project prepared by Shenzhen Seg for more than 1 year was finally settled in the Shanshen Specail Cooperation Zone It is known that Saige Longyan Thin Film PV Industry Garden was invested and constructed by Shenzhen Seg, Longyan Energy Technology Hangzhou Co.Asian Metal Copyright and Shenzhen Energy Nanjing Holding Company.Asian Metal Copyright and Shenzhen Energy Nanjing Holding Company.Asian Metal Copyright Constructed based on the layout of headquarter in Shenzhen and bases in Shenshan Specail Cooperation Zone, the project will include 2 production lines with an annual capacity of 40MW of CdTe thin film solar battery module and is expected to be completed construction and put into operation gradually within 15 months.
    .Asian Metal Copyright and Shenzhen Energy Nanjing Holding CompanyAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.