• Antimony Ingot 99.65%min IW Rotterdamdown(-500)  07-31|Chromic Anhydride 99.8%min EXW Chinadown(-500)  07-31|Mercury Metal 99.9%min Ex-VAT EXW Chinaup(50)  07-31|Titanium Sponge 99.7%min EXW Chinadown(-1000)  07-31|Coal Tar Pitch Coking Value 56%min EXW Chinaup(100)  07-31|Mercury Metal 99.999%min Ex-VAT EXW Chinaup(50)  07-31|Ferro-silicon 75%min IW Pittsburghdown(-0.02)  07-31|Lithium Metal 99%min Delivered Chinadown(-20000)  07-31|Lithium Metal 99.9%min Delivered Chinadown(-20000)  07-31|Titanium Ingot TA2 EXW Chinadown(-1000)  07-31|Titanium Plate TA2 6-8mm EXW Chinadown(-1)  07-31|Aluminum Fluoride 61%min EXW Chinaup(200)  07-31|Cobalt Tetroxide 73.5%min Delivered Chinadown(-5)  07-31|Samarium Cobalt 30H EXW Chinadown(-5)  07-31
  • Jiangsu Guotai plans to carry out 40,000tpy-capacity lithium battery solution project in Poland

    2017-12-27 17:20:36   [Print]
    Recently, Jiangsu Guotai International Group ("Guotai") announced that it planned to build lithium battery solution project ("the Project") with a capacity of 40,000tpy in Poland.Asian Metal Copyright .Asian Metal Copyright Specifically, the project has a total investment of RMB300 million including RMB105 million of infrastructure investment, RMB80 million of equipment investment, RMB6.Asian Metal Copyright, Ltd.Asian Metal Copyright6 million of land cost and RMB108.Asian Metal Copyright Jiangsu Ruitai New Energy Materials Co.Asian Metal Copyright4 million of initial working capital and a construction period of about 30 months.

    Jiangsu Ruitai New Energy Materials Co., Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright, Guotai's wholly-owned subsidiary, and Zhangjiagang Guotai Huarong Chemical New Material Co.Asian Metal Copyright4 million of initial working capital and a construction period of about 30 months.Asian Metal Copyright, Ltd.Asian Metal Copyright4 million of initial working capital and a construction period of about 30 months.Asian Metal Copyright, Guotai's holding subsidiary, will contribute 50% of the investment respectively to set up a subsidiary in the Republic of Poland named Guotai Huarong (Poland) Co.Asian Metal Copyright4 million of initial working capital and a construction period of about 30 months.Asian Metal Copyright, Ltd.Asian Metal Copyright6 million of land cost and RMB108.Asian Metal Copyright (tentative name) which will be responsible for carrying out the Project in Poland.

    .Asian Metal CopyrightRecently, Jiangsu Guotai International Group "Guotai" announced that it planned to build lithium battery solution project "the Project" with a capacity of 40,000tpy in PolandAsian Metal Copyright
    Lithium Carbonate 99.5%min Delivered EU
    Unit:USD/kg
    Lithium Carbonate 99.5%min Delivered EU USD/kg
    China's ithium iron phosphate producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.