• Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Drills 88%min Ex-VAT Delivered Chinadown(-15)  09-18|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinadown(-15)  09-18|Calcined Pet Coke S 3%max EXW Chinaup(100)  09-18|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.4)  09-18|Tungsten APT 88.5%min In warehouse Rotterdamup(15)  09-18|Tungsten APT 88.5%min FOB Chinaup(15)  09-18|Bismuth Ingot 99.99%min EXW Chinaup(3000)  09-18|Ferro-tungsten 75%min In warehouse Rotterdamup(2)  09-18|Bismuth Oxide 99.9%min EXW Chinaup(3000)  09-18|Germanium Metal 99.99%min Delivered Europeup(100)  09-18|Germanium Metal 99.99%min Delivered USup(100)  09-18|Rebar BS4449 GR500 16mm In warehouse Kuala Lumpurdown(-50)  09-18|Wire Rod SAE1008 5.5mm In warehouse Kuala Lumpurdown(-50)  09-18
  • Power supply cut off for Luoyang abrasives companies due to stricter environmental protection

    2017-12-15 17:34:59   [Print]
    On the morning of December 13th, Luoyang Environmental Pollution Prevention and Control Office issued an emergency notice that power supply will be cut off from December 12, 2017 to March 15, 2018 for companies that carried out peak-shifting production and those who suspended or limited production from industries of cement, ceramic, nonferrous smelting and soldering, etc.Asian Metal Copyright According to the notice, companies that are required to make peaking-shifting production from November 15, 2017 to March 15, 2018, including sintered brick plants, refractory enterprises and casting enterprises using coal, coal gas or carbon as fuel, will experience power outage till March 15, 2018.Asian Metal Copyright Other companies that suspended production due to emergency controls will also experience power outage during the same period.

    According to the notice, companies that are required to make peaking-shifting production from November 15, 2017 to March 15, 2018, including sintered brick plants, refractory enterprises and casting enterprises using coal, coal gas or carbon as fuel, will experience power outage till March 15, 2018. And the same goes to companies which are required to limit production from November 15, 2017 to March 15, 2018, including nonferrous smelting enterprises, silica enterprises, fused alumina enterprises, abrasives companies (excluding those specially approved by government) and so on.

    According to the notice, related companies shall be informed before the power outage during which the brake pull-rods will be kept by the power-supply institution.

    During the power outage, if the production electricity and household electricity are inseparable, companies can cut off power or shut down production equipment and production lines in order to limit production and guarantee people's livelihood to the maximum extent. In addition, companies shall get approval from local government before performing maintenance on equipment with power on during the period and cut offer power after the maintenance.

    .Asian Metal Copyright In addition, companies shall get approval from local government before performing maintenance on equipment with power on during the period and cut offer power after the maintenanceAsian Metal Copyright
    Zircon Sand Australian Zr(Hf)O2 66%min In port China
    Unit:RMB/mt
    Zircon Sand Australian Zr(Hf)O2 66%min In port China RMB/mt
    China zirconium silicate producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.