• Yttrium Oxide 99.999%min In warehouse Rotterdamup(20)  12-01|Yttrium Oxide 99.999%min FOB Chinaup(1.4)  12-01|Zinc Conc. TC 50%min CIF Chinadown(-5)  12-01|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(20000)  12-01|Zinc Conc. 50%min EXW Chinaup(540)  12-01|NCM 8312 Delivered Chinadown(-3400)  12-01|Tin Conc. Burmese 20%min In warehouse MengAup(8000)  12-01|Prebaked Anode S 3%max EXW Chinaup(150)  12-01|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(20000)  12-01|Neodymium Oxide 99.5%min EXW Chinaup(17000)  12-01|Tin Conc. Burmese 30%min In warehouse MengAup(8000)  12-01|Spodumene Li2O 5%min In port Chinaup(40)  12-01|Praseodymium Oxide 99.5%min EXW Chinaup(17000)  12-01|Neodymium Metal 99%min EXW Chinaup(20000)  12-01
  • Thai welded pipe market dim

    2015-07-24 09:06:44   [Print]
    BEIJING (Asian Metal) 24 Jul 15 - Thai welded pipe market runs slowly without the strong support from downstream demand at this moment.Asian Metal Copyright75mm is THB20,500t USD588t, unchanged compared with that of last week.Asian Metal Copyright Insiders foresee an inactive welded pipe market in Thailand in following several weeks.

    A trader from Bangkok tells Asian Metal that the price of welded pipe ASTM A53B Φ114.3mm*3.75mm is THB20,000/t (USD574/t), the same as that of last week.

    Noted by the source, the demand for welded pipe remains stagnant and the sales performance for most local traders is not quite satisfying. According to him, his current daily sales volume for welded pipe is 300t against 600-700t in the high season.Asian Metal CopyrightBEIJING Asian Metal 24 Jul 15 - Thai welded pipe market runs slowly without the strong support from downstream demand at this moment.Asian Metal Copyright He tells Asian Metal that the construction industry runs slowly in Thailand and the welded pipe market is likely to remain sluggish for some time.

    An end user from Rayong reports that the procurement price of welded pipe ASTM A53B Φ114.3mm*3.75mm is THB20,500/t (USD588/t), unchanged compared with that of last week.

    The source confirms a dim steel market and sluggish construction industry. According to him, there are not many construction projects in local market for the time being.Asian Metal Copyright75mm is THB20,500t USD588t, unchanged compared with that of last week.Asian Metal Copyright He has reduced the purchasing volume from 1,000tpm in the high season to the current one of 200-300tpm.Asian Metal Copyright75mm is THB20,500t USD588t, unchanged compared with that of last week.Asian Metal Copyright He doesn’t believe that Thai welded pipe market will recover in the near future.
    .Asian Metal Copyright He doesn’t believe that Thai welded pipe market will recover in the near futureAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.