• NCM 523 Delivered Chinaup(2600)  10-22|Cobalt Tetroxide 73.5%min Delivered Chinaup(9)  10-22|LNCMO 613 PC Delivered Chinaup(4)  10-22|NCM 8312 Delivered Chinaup(2900)  10-22|NdFeB Sintered Rough N35 Block EXW Chinadown(-4)  10-22|NCM 613 Delivered Chinaup(2400)  10-22|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  10-22|LNCMO 523 PC Delivered Chinaup(4)  10-22|Spodumene Li2O 5%min In port Chinaup(30)  10-22|Neodymium Metal 99%min EXW Chinadown(-20000)  10-22|Lithium Cobaltate Co 60%min Delivered Chinaup(9)  10-22|Cobalt Oxide 72%min In warehouse Rotterdamup(0.8)  10-22|LNCMO 523 SC Delivered Chinaup(4)  10-22|Erbium Oxide 99.5%min In warehouse Rotterdamup(1.5)  10-22
  • AsianMetal
    Events & Holidays
    event

    Seamless Pipe Market Report March 2014

    2014-04-02 14:50:28   【Print】
    The following is a brief synopsis of the report. Your access is restricted as it is a subscription based service.
    Please contact us for a subscription.
    Seamless pipe prices continued on a downward trend in March, coupled with participants’ wait-and-see attitudes.Asian Metal Copyright Insiders do not expect the price to rebound in April.Asian Metal Copyright Though March is regarded as the traditional peak season for seamless pipe consumption, the market performance made no progress with the absence of strong demand from downstream industries.Asian Metal CopyrightSeamless pipe prices continued on a downward trend in March, coupled with participants’ wait-and-see attitudes.Asian Metal Copyright In the meantime, facing unhealthy capital flow, some influential enterprises were forced to close down, and the overall prospects were none too unpromising.Asian Metal CopyrightSeamless pipe prices continued on a downward trend in March, coupled with participants’ wait-and-see attitudes.Asian Metal Copyright Insiders do not expect the price to rebound in April.
    .Asian Metal Copyright Insiders do not expect the price to rebound in AprilAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.