• Copper Cathode 99.99%min Delivered China(4300)  05-20|Copper Conc. 20%min Delivered China(4000)  05-20|Copper Scrap Wire 99%min Delivered China(4000)  05-20|Copper Conc. TC 25%min CIF China(-1)  05-20|Antimony Ingot 99.65%min EXW China(4500)  05-20|Antimony Ingot 99.85%min EXW China(4500)  05-20|Antimony Conc. 50%min Delivered China(3500)  05-20|Antimony Trioxide 99.5%min Delivered China(3500)  05-20|Antimony Trioxide 99.8%min Delivered China(3500)  05-20|Tin Conc. Burmese 20%min In warehouse MengA(7000)  05-20|Indium Ingot 99.995%min Delivered US(8)  05-20|Nickel Cathode 99.96%min EXW China(4500)  05-20|Nickel Cathode Norilsk 99.96%min In port China(4400)  05-20|Tin Conc. Burmese 30%min In warehouse MengA(7000)  05-20
  • Section Steel Market Report March 2012

    2012-04-01 08:56:56   【Print】
    The following is a brief synopsis of the report. Your access is restricted as it is a subscription based service.
    Please contact us for a subscription.
    This month, driven by rising raw material prices, those of section steel in major domestic markets all witnessed upward trends.Asian Metal Copyright Insiders believe the market will become more active in the following month with prices going up further.Asian Metal Copyright Meanwhile, as the weather gradually turned warmer, the downstream construction projects also increased, which led to the increasing demand and this was another reason for the price to go up.Asian Metal Copyright Insiders believe the market will become more active in the following month with prices going up further.Asian Metal Copyright Insiders believe the market will become more active in the following month with prices going up further.
    .Asian Metal CopyrightThis month, driven by rising raw material prices, those of section steel in major domestic markets all witnessed upward trendsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.