• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Fujian Youli to build 50,000tpa LFP recycling project

    2024-03-28 11:56:59   [Print]
    Fujian Youli New Energy Co.Asian Metal CopyrightFujian Youli New Energy Co.Asian Metal Copyright, Ltd.Asian Metal Copyright85 million USD63.Asian Metal Copyright plans to build the phase one of 50,000tpa LFP comprehensive utilization project, according to the preliminary environmental impact assessment (EIA) recently released for public disclosure.

    The phase one, with a total investment of RMB457.85 million (USD63.Asian Metal Copyright, Ltd.Asian Metal Copyright37 million), would have a floor area of 43,610 square meters and add 20,000tpa of LFP production capacity through recycling.

    .Asian Metal CopyrightFujian Youli New Energy CoAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium nickel cobalt manganese oxide producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.