• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Zhejiang Tiantie to build graphite anode material project

    2024-02-21 11:57:07   [Print]
    Zhejiang Tiantie Industry Co.Asian Metal CopyrightZhejiang Tiantie Industry Co.Asian Metal Copyright, Ltd.Asian Metal Copyright When fully operational, it is expected to achieve an annual production value of RMB2.Asian Metal Copyright has received board approval to sign an investment agreement with the management committee of Lujiang High Tech Industrial Development Zone in Hefei, Anhui.Asian Metal Copyright91 million.Asian Metal Copyright The company plans to build a 100,000tpa modified graphite anode material project at Lujiang High Tech Industrial Development Zone, with a total investment of around RMB1.Asian Metal Copyright91 million.Asian Metal Copyright45 billion (USD202 million).

    The project is expected to break ground before late June 2024 and complete construction by late June 2026. When fully operational, it is expected to achieve an annual production value of RMB2.Asian Metal Copyright5 billion USD348 million and generate tax revenue of around RMB100 million USD13.Asian Metal Copyright5 billion (USD348 million) and generate tax revenue of around RMB100 million (USD13.Asian Metal Copyright45 billion USD202 million.Asian Metal Copyright91 million).

    The company said the project would further expand its strategic presence in the lithium battery market as graphite anode material remains the mainstream of lithium battery anode materials.

    .Asian Metal Copyright The project is expected to break ground before late June 2024 and complete construction by late June 2026Asian Metal Copyright
    Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99%min producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.