• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Tibet Mining's Zabuye phase two lithium carbonate project finishes construction

    2023-11-21 11:19:57   [Print]
    Tibet Mining announced that the phase two of Zabuye salt lake lithium extraction project has completed equipment and pipeline installation, with key facilities in trial run currently.Asian Metal Copyright The phase two broke ground in June 2022 and will soon enter the commissioning stage following the recent completion of construction.Asian Metal Copyright The phase two broke ground in June 2022 and will soon enter the commissioning stage following the recent completion of construction.

    Zabuye phase two project, using membrane separation and evaporative crystallization process to extract lithium and potassium, is designed to produce 9,600t of battery grade lithium carbonate and 2,400t of industrial grade lithium carbonate annually. It also produces byproducts with annual capacity of 156,000t of potassium chloride and 200t of rubidium-cesium salts.

    .Asian Metal Copyright Asian Metal Copyright
    Lithium Carbonate 99.5%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99%min producers' inventory to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.