• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Hubei Haigus lithium battery materials project breaks ground

    2023-09-27 12:00:39   [Print]
    On September 22, Hubei Haigus New Energy Co.Asian Metal Copyright The project will be developed in two phases.Asian Metal Copyright, Ltd.Asian Metal Copyright81 billion.Asian Metal Copyright, a wholly-owned subsidiary of Shenhong Group, broke ground on its lithium battery materials project with a total investment of RMB18.Asian Metal Copyright Phase one will build production line with capacity of 100,000tpa of iron phosphate and 100,000tpa of LFP and it is expected to become fully operational by October 2024.Asian Metal Copyright6 billion (USD2.Asian Metal Copyright This is also represents the largest investment project ever developed in Yidu city.Asian Metal Copyright55 billion) at Yidu Chemical Industry Park in Hubei.Asian Metal Copyright6 billion USD2.Asian Metal Copyright This is also represents the largest investment project ever developed in Yidu city.

    Upon completion, the project is capable of producing 500,000t of iron phosphate and 300,000t of lithium iron phosphate (LFP) annually and is expected to achieve annual production value of RMB27.8 billion (USD3.Asian Metal CopyrightOn September 22, Hubei Haigus New Energy Co.Asian Metal Copyright81 billion).

    The project will be developed in two phases. Phase one will build production line with capacity of 100,000tpa of iron phosphate and 100,000tpa of LFP and it is expected to become fully operational by October 2024.

    .Asian Metal CopyrightOn September 22, Hubei Haigus New Energy CoAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium cobaltate producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.