• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • Huihong Mining to build two 3ktpa high-purity vanadium pentoxide beneficiation and smelting production lines

    2023-05-15 16:48:02   [Print]
    Wintime Energy noted on the investor interaction platform recently that the average grade of vanadium ore resources of Huihong Mining (a company affiliated to the company) reaches 1.Asian Metal Copyright Huihong Mining will construct two 3ktpa high-purity vanadium pentoxide beneficiation and smelting production lines, with the first phase designed to produce 3,000t of vanadium pentoxide per year, which is expected to commence construction in June 2023.Asian Metal Copyright06%.Asian Metal CopyrightWintime Energy noted on the investor interaction platform recently that the average grade of vanadium ore resources of Huihong Mining a company affiliated to the company reaches 1.Asian Metal Copyright Huihong Mining will construct two 3ktpa high-purity vanadium pentoxide beneficiation and smelting production lines, with the first phase designed to produce 3,000t of vanadium pentoxide per year, which is expected to commence construction in June 2023.Asian Metal Copyright Huihong Mining will construct two 3ktpa high-purity vanadium pentoxide beneficiation and smelting production lines, with the first phase designed to produce 3,000t of vanadium pentoxide per year, which is expected to commence construction in June 2023.Asian Metal Copyright At present, Huihong Mining is adopting advanced technology and new processes to carry out production line design and other work.
    .Asian Metal CopyrightWintime Energy noted on the investor interaction platform recently that the average grade of vanadium ore resources of Huihong Mining a company affiliated to the company reaches 1Asian Metal Copyright
    Vanadium Pentoxide Flake 98%min In port China
    Unit:RMB/mt
    China vanadium pentoxide powder producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.