• Copper Conc. TC 25%min CIF China(-1)  05-31|Manganese Ore Australian 45%min In Tianjin Port(4)  05-31|Manganese Ore Gabonese 44%min In Tianjin Port(3.7)  05-31|Manganese Ore Brazilian 44%min In Tianjin Port(3.5)  05-31|Manganese Ore Australian 45%min In Qinzhou Port(2)  05-31|Antimony Ingot 99.65%min In warehouse Baltimore(0.24)  05-31|Indium Ingot 99.995%min Delivered US(9)  05-31|Silicon Metal 5-5-3 In port India(5)  05-31|Cobalt Metal 99.8%min Delivered China(-6)  05-31|Silicon Metal 98.5%min Delivered US(0.05)  05-31|Ferro-silicon 72%min EXW China(200)  05-31|Indium Ingot 99.995%min Delivered Europe(9)  05-31|Indium Ingot 99.995%min FOB China(10)  05-31|Bismuth Ingot 99.99%min EXW China(2000)  05-31
  • Envision AESC signs agreement on phase two 20GWh batter project in Erdos

    2023-04-17 14:33:23   [Print]
    On April 14 in Shanghai, governments of Erdos City and Ejin Horo Banner signed a project cooperation agreement with Envision AESC on investment in phase two of the smart battery industrial park project in Erdos.

    Phase two of the project has a designated production capacity of 20GWh, and will focus on high-quality battery production for global clients. Its annual production value is expected to be over RMB24 billion (USD3.Asian Metal CopyrightOn April 14 in Shanghai, governments of Erdos City and Ejin Horo Banner signed a project cooperation agreement with Envision AESC on investment in phase two of the smart battery industrial park project in Erdos.Asian Metal Copyright49 billion) when going into operation.

    Phase one of the project has a 10.5GWh capacity and already went into operation in April 2022, with over 5 million units of battery cells delivered so far.


    .Asian Metal Copyright Asian Metal Copyright
    Cobalt Intermediate 30-40% CIF China
    Unit:USD/lb Co
    China cobalt tetroxide producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.