• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • Nanning Chenyu initiates construction of 100ktpy Li-battery anode material project

    2023-02-22 14:32:39   [Print]
    On February 17, a groundbreaking ceremony was held in Nanning Liujing Industrial Park to launch construction of the 100,000tpy Li-battery anode material project invested by Nanning Chenyu.Asian Metal Copyright .Asian Metal Copyright With a designated 100,000tpy high-performance Li-ion battery anode material production capacity and a planned plant area of 200,000 square meters, the project is expected to have its stage-one carbon anode material production lines to be built and go into operation at the end of 2023.

    .Asian Metal Copyright With a designated 100,000tpy high-performance Li-ion battery anode material production capacity and a planned plant area of 200,000 square meters, the project is expected to have its stage-one carbon anode material production lines to be built and go into operation at the end of 2023Asian Metal Copyright
    Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99%min producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.