• Manganese Ore Gabonese 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Qinzhou Port(3.1)  05-15|Manganese Ore Gabonese 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Brazilian 44%min In Tianjin Port(3.1)  05-15|Manganese Ore Australian 45%min In Qinzhou Port(3)  05-15|Manganese Ore Australian 45%min In Tianjin Port(3)  05-15|Copper Conc. TC 25%min CIF China(-1)  05-15|Antimony Trioxide 99.8%min Delivered China(3000)  05-15|Tungsten APT 88.5%min FOB China(10)  05-15|Lithium Carbonate 99.2%min Delivered China(-3000)  05-15|Lithium Carbonate 99.5%min Delivered China(-3000)  05-15|Tungsten Oxide WO3 99.95%min FOB China(10)  05-15|Tin Conc. Burmese 20%min In warehouse MengA(6000)  05-15|Lithium Manganate Mn 58% Delivered China(-1000)  05-15
  • BYD's new energy vehicle parts project of RMB10 billion breaks ground

    2023-02-20 11:40:33   [Print]
    A ceremony was held on February 18th in Changzhou National High-Tech Zone to celebrate concentrated signing and building of major projects in 2023 as well as the ground-breaking of BYD New Energy Vehicle Key Parts Industrial Park Project.Asian Metal CopyrightA ceremony was held on February 18th in Changzhou National High-Tech Zone to celebrate concentrated signing and building of major projects in 2023 as well as the ground-breaking of BYD New Energy Vehicle Key Parts Industrial Park Project.Asian Metal Copyright The construction of 35 projects in this zone was launched this time with a total investment of RMB28.Asian Metal Copyright46 billion and could produce 300,000 sets of smart powertrain, transmission system and other key parts per year after the construction is completed.Asian Metal Copyright1 billion (USD4.Asian Metal Copyright46 billion and could produce 300,000 sets of smart powertrain, transmission system and other key parts per year after the construction is completed.Asian Metal Copyright09 billion), including 13 new energy vehicle and vehicle key parts projects, 4 smart energy projects and 4 new material projects.

    Located in Binjiang Economic Development Zone, BYD New Energy Vehicle Key Parts Industrial Park Project has a total investment of about RMB10 billion (USD1.46 billion) and could produce 300,000 sets of smart powertrain, transmission system and other key parts per year after the construction is completed.


    .Asian Metal Copyright The construction of 35 projects in this zone was launched this time with a total investment of RMB28Asian Metal Copyright
    Magnesium Alloy AZ91D EXW China
    Unit:RMB/mt
    China magnesium alloy producers' sales volume statistics by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.