• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Shaanxi strives to produce 750Mt of coal in 2023

    2023-01-30 13:58:19   [Print]
    The Report on the Work of the Shaanxi Government indicates that Shaanxi has completed energy supply work successfully and shipped approximately 500 million tons of coal and 60,000GWh of electricity in 2022.Asian Metal CopyrightThe Report on the Work of the Shaanxi Government indicates that Shaanxi has completed energy supply work successfully and shipped approximately 500 million tons of coal and 60,000GWh of electricity in 2022.Asian Metal Copyright The government decides to improve the support of its energy industry in 2023 and strive to commence construction of four coal mines to make sure its coal output to reach 750 million tons.Asian Metal Copyright4%, and expand the total installed capacity to 40GW with the newly installed new energy capacity of 10GW in 2023.Asian Metal Copyright It plans to generate 290,000GWh of electricity, up by 7.Asian Metal Copyright The government decides to improve the support of its energy industry in 2023 and strive to commence construction of four coal mines to make sure its coal output to reach 750 million tons.Asian Metal Copyright4%, and expand the total installed capacity to 40GW with the newly installed new energy capacity of 10GW in 2023.Asian Metal Copyright4%, and expand the total installed capacity to 40GW with the newly installed new energy capacity of 10GW in 2023.Asian Metal Copyright Moreover, more than 10 gigawatts of coal projects will be launched in Shaanxi in 2023.
    .Asian Metal Copyright It plans to generate 290,000GWh of electricity, up by 7Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.