• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Jiangsu Xingda Iron and Steel Group to transfer 1.2Mtpy iron-making capacity

    2022-12-15 17:12:40   [Print]
    In accordance with relevant guidelines and implementation measures issued by the State Council, the capacity transfer scheme announced by Jiangsu Xingda Iron and Steel Group Co.Asian Metal Copyright2 million tonnes per year to Jiangyin Xingcheng Special Steel Works Co.Asian Metal Copyright, Ltd.Asian Metal Copyright,Ltd.Asian Metal Copyright will be made public by Xuzhou Industrial and Information Technology Bureau for from December 13 to 19, 2022.

    According to the scheme, the company plans to transfer its iron-making capacity of 1.2 million tonnes per year to Jiangyin Xingcheng Special Steel Works Co.Asian Metal Copyright .Asian Metal Copyright,Ltd.
    .Asian Metal Copyright According to the scheme, the company plans to transfer its iron-making capacity of 1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.