• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • Huaxin Industrial signs 3Mtpy high-quality plate project

    2022-11-21 18:00:14   [Print]
    On November 16, Huaxin Industrial signed a contract for 3Mtpy high-quality plate project with the Daye Municipal Government of Hubei Province.Asian Metal Copyright405 billion, the project will mainly build a 1,280m3 blast furnace and a 130-ton converter, as well as public and auxiliary facilities including the construction of sintering, pelletizing and plate production lines, oxygen production, lime kiln, power generation, sewage treatment and others.Asian Metal Copyright With a total investment of RMB10 billion (USD1.Asian Metal CopyrightOn November 16, Huaxin Industrial signed a contract for 3Mtpy high-quality plate project with the Daye Municipal Government of Hubei Province.Asian Metal Copyright405 billion), the project will mainly build a 1,280m3 blast furnace and a 130-ton converter, as well as public and auxiliary facilities including the construction of sintering, pelletizing and plate production lines, oxygen production, lime kiln, power generation, sewage treatment and others.Asian Metal Copyright With a total investment of RMB10 billion USD1.Asian Metal Copyright After the project is put into operation and reaches the designed efficiency, it can realize an annual output value of about RMB20 billion (USD2.Asian Metal Copyright With a total investment of RMB10 billion USD1.Asian Metal Copyright81 billion) and tax payment of about RMB2.Asian Metal Copyright After the project is put into operation and reaches the designed efficiency, it can realize an annual output value of about RMB20 billion USD2.Asian Metal Copyright2 billion (USD309 million).
    .Asian Metal Copyright With a total investment of RMB10 billion USD1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.