• Copper Conc. TC 25%min CIF China(-1)  05-17|Nickel Cathode Norilsk 99.96%min In port China(4300)  05-17|Indium Ingot 99.995%min Delivered Europe(8)  05-17|TMT Bar Fe500 16mm In warehouse Mumbai(1500)  05-17|Nickel Cathode 99.96%min EXW China(4300)  05-17|TMT Bar Fe500 12mm In warehouse Mumbai(1500)  05-17|Indium Ingot 99.995%min FOB China(10)  05-17|Rebar HRB400 20mm FOB China(15)  05-17|Wire Rod SAE1008 5.5mm In warehouse Mumbai(1500)  05-17|Wire Rod Q195 6.5mm FOB China(15)  05-17|Wire Rod SAE1008 6.5mm FOB China(15)  05-17|Rebar HRB400 12mm FOB China(15)  05-17|Indium Ingot 99.995%min Delivered US(7)  05-17|Cobalt Metal 99.8%min Delivered China(5)  05-17
  • EVE-Linyang puts first production line of 10GWh energy storage battery project into operation

    2022-11-21 11:50:57   [Print]
    Linyang Energy announced recently that its joint-stock company, EVE-Linyang completed equipment installment and debugging of the first production line of a 10GWh energy storage battery project on November 18th, indicating that the project went into formal operation.Asian Metal Copyright The project totally owns three production lines, which will successively complete debugging and go into operation.Asian Metal Copyright The project totally owns three production lines, which will successively complete debugging and go into operation.

    .Asian Metal CopyrightLinyang Energy announced recently that its joint-stock company, EVE-Linyang completed equipment installment and debugging of the first production line of a 10GWh energy storage battery project on November 18th, indicating that the project went into formal operationAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium carbonate 99.5%mi producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.