• Erbium Oxide 99.5%min EXW China(9)  04-29|Copper Conc. TC 25%min CIF China(-1)  04-29|Selenium Powder 99.9%min Delivered India(50)  04-29|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-29|Arsenic Metal 99.9999%min Delivered China(-7)  04-29|Silicon Metal 98.5%min Delivered US(0.04)  04-29|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-29|Met. Coke A 13%max, S 0.7%max EXW Hebei(50)  04-29|Met. Coke A 13%max, S 0.7%max EXW Shandong(50)  04-29|Zinc Conc. TC 50% CIF China(-1.5)  04-29|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-29|Ferro-chrome Cr 60%min, C 8%max In warehouse Rotterdam(-0.04)  04-29|Ferro-tungsten 75%min In warehouse Rotterdam(1)  04-29|Ferro-tungsten 75%min FOB Russia(1)  04-29
  • Wintime Energy: Haizetan Coal Mine obtains mining license

    2022-11-08 16:27:44   [Print]
    Wintime Energy recently announced that Haizetan Coal Mine of Shaanxi Yihua Mining Development Co.Asian Metal Copyright144 billion tons, and the coal types are mainly chemical coal long-flame coal, non-caking coal and weak-caking coal and high-quality power coal.Asian Metal Copyright, Ltd.Asian Metal Copyright, affiliated to the company, obtained the Mining License issued by the Department of Natural Resources of Shaanxi Province.Asian Metal Copyright, affiliated to the company, obtained the Mining License issued by the Department of Natural Resources of Shaanxi Province.

    Haizetan Coal Mine is located in the south area of Yuheng Mining Area, one of the "Three Western" areas in Shanxi, Shaanxi and western Inner Mongolia. The mine field is a low-gas mine with simple structure.Asian Metal Copyright, affiliated to the company, obtained the Mining License issued by the Department of Natural Resources of Shaanxi Province.Asian Metal Copyright The identified resource volume reaches about 1.Asian Metal Copyright The mine field is a low-gas mine with simple structure.Asian Metal Copyright144 billion tons, and the coal types are mainly chemical coal (long-flame coal, non-caking coal and weak-caking coal) and high-quality power coal.

    The project is planned to start construction in the first quarter of 2023, meet the coal production conditions in the third quarter of 2026, and achieve the designed production capacity in 2027.
    .Asian Metal Copyright The identified resource volume reaches about 1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.