• Copper Conc. TC 25%min CIF China(-1)  05-17|Nickel Cathode Norilsk 99.96%min In port China(4300)  05-17|Indium Ingot 99.995%min Delivered Europe(8)  05-17|TMT Bar Fe500 16mm In warehouse Mumbai(1500)  05-17|Nickel Cathode 99.96%min EXW China(4300)  05-17|TMT Bar Fe500 12mm In warehouse Mumbai(1500)  05-17|Indium Ingot 99.995%min FOB China(10)  05-17|Rebar HRB400 20mm FOB China(15)  05-17|Wire Rod SAE1008 5.5mm In warehouse Mumbai(1500)  05-17|Wire Rod Q195 6.5mm FOB China(15)  05-17|Wire Rod SAE1008 6.5mm FOB China(15)  05-17|Rebar HRB400 12mm FOB China(15)  05-17|Indium Ingot 99.995%min Delivered US(7)  05-17|Cobalt Metal 99.8%min Delivered China(5)  05-17
  • KBC to build 10,000tpy integrated demonstration line for toner used in lithium-ion battery anode material field

    2022-08-05 14:48:44   [Print]
    KBS announced on August 4th that it will build a 10,000tpy integrated demonstration line for toner used in lithium-ion battery anode material field with a total investment of no more than RMB281 million (USD41.Asian Metal Copyright The project is expected to start building in August 2022 and realize full production in August 2023 with a building period of one year.Asian Metal Copyright65 million).Asian Metal Copyright65 million.Asian Metal Copyright The project is expected to start building in August 2022 and realize full production in August 2023 with a building period of one year.


    .Asian Metal CopyrightKBS announced on August 4th that it will build a 10,000tpy integrated demonstration line for toner used in lithium-ion battery anode material field with a total investment of no more than RMB281 million USD41Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.