• Manganese Ore Carbonate, Mn 13%min EXW China(2)  05-13|Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  05-13|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  05-13|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  05-13|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  05-13|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  05-13|Manganese Ore Brazilian 44%min In Qinzhou Port(2.5)  05-13|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  05-13|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  05-13|Manganese Ore Australian 45%min In Tianjin Port(2.5)  05-13|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  05-13|Copper Conc. TC 25%min CIF China(-1)  05-13|Ferro-manganese Mn 65%min, C 7%max EXW China(200)  05-13|Ferro-tungsten 75%min FOB China(1.3)  05-13
  • HBIS Wusteel independently produces 6907t of advanced wind power steel plate

    2022-06-30 17:02:05   [Print]
    On June 24, HBIS Wusteel delivered its first self-developed batch of 6,970t of advanced wind power steel plate successfully, which would be exclusively used for the construction of key parts in VineyardWind project, the America's first approved offshore wind power farm to be built in a commercial size.
      Copyright © Asian Metal Ltd All rights reserved.