• Manganese Ore S.A. 36%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 36%min In Tianjin Port(2.5)  04-28|Manganese Ore S.A. 37%min In Qinzhou Port(2.5)  04-28|Manganese Ore S.A. 37%min In Tianjin Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Qinzhou Port(2.5)  04-28|Manganese Ore Australian 45%min In Qinzhou Port(2.5)  04-28|Manganese Ore Gabonese 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Australian 45%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Tianjin Port(2.5)  04-28|Manganese Ore Brazilian 44%min In Qinzhou Port(1.5)  04-28|Manganese Ore Carbonate, Mn 13%min EXW China(1)  04-28|Selenium Powder 99.9%min Delivered India(50)  04-28|Met. Coke A 13%max, S 0.7%max EXW Shanxi(50)  04-28|Copper Conc. TC 25%min CIF China(-1)  04-28
  • Xiaogan JINDA Steel's capacity replacement scheme released

    2022-06-17 16:02:10   [Print]
    The Department of Economy and Information Technology of Hubei Province on June 16 released the capacity replacement scheme drawn up by Xiaogan JINDA Steel Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.

    According to the scheme, the company will build a 50-ton alloy steel electric furnace with capacity of 360,000tpy to replace its 40-ton furnace with capacity of 400,000tpy at the ratio of 1:1.

    Construction of the new furnace is scheduled to commence in June 2022 with production expected in June 2024.

    .Asian Metal CopyrightThe Department of Economy and Information Technology of Hubei Province on June 16 released the capacity replacement scheme drawn up by Xiaogan JINDA Steel CoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.