• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • China Energy Xinjiang Branch's 19Mtpy coal mine capacity increase approved

    2022-04-29 15:02:20   [Print]
    On April 15, a total production capacity increase of 19 million tons per year (Mtpy) of the three open-pit coal mines of China Energy Xinjiang Branch was approved by the State Administration of Mine Safety.

    In detail, the capacity of Zhundong open-pit coal mine rose from 20 Mtpy to 26 Mtpy; that of Hongshaquan no.1 open-pit coal mine increased from 10 Mtpy to 20 Mtpy; that of Heishan open-pit coal mine went up from 10 Mtpy to 13 Mtpy.

    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.