Yaoning Technology to build LFP battery project
2022-04-28 12:03:53
[Print]
On April 27, Jiangxi Yingtan High-tech Zone and Yaoning Technology successfully signed a contract for the LFP battery project with an annual production capacity of 20GWh.Asian Metal Copyright The total investment for the project is 10 billion yuan 1.Asian Metal Copyright The total investment for the project is 10 billion yuan (1.Asian Metal CopyrightOn April 27, Jiangxi Yingtan High-tech Zone and Yaoning Technology successfully signed a contract for the LFP battery project with an annual production capacity of 20GWh.Asian Metal Copyright52 billion US dollars), and a production line with an annual production capacity of 4GWh will be built in the first phase.
.Asian Metal CopyrightOn April 27, Jiangxi Yingtan High-tech Zone and Yaoning Technology successfully signed a contract for the LFP battery project with an annual production capacity of 20GWhAsian Metal Copyright
Lithium Iron Phosphate Li 3.9%min Delivered China
Unit:RMB/mt
China lithium nickel cobalt manganese oxide producers' operating rate statistics by province by month
Unit: %