• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Baowu Special Metallurgy (Maanshan)'s capacity replacement project made public

    2022-04-21 16:54:30   [Print]
    In accordance with relevant guidelines and implementation measures issued by the State Council, the capacity replacement program of Baowu Special Metallurgy (Maanshan) Gao Jin Technology Co.Asian Metal CopyrightIn accordance with relevant guidelines and implementation measures issued by the State Council, the capacity replacement program of Baowu Special Metallurgy Maanshan Gao Jin Technology Co.Asian Metal Copyright, Ltd.Asian Metal Copyright .Asian Metal Copyright's 50t electric furnaces project was made public on April 20 by the Department of Economy and Information Technology of Anhui province for a period from April 20, 2022 to May 18, 2022.

    According to the replacement program, Baosteel Group Special Steel will shut down capacity of 360ktpy and Baowu Special Metallurgy (Maanshan) Gao Jin Technology will build capacity of 360ktpy. The ratio of the capacity replacement is 1:1.

    .Asian Metal Copyright, LtdAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.