• Copper Conc. TC 25%min CIF China(-1)  05-21|Antimony Trioxide 99.8%min Delivered China(5000)  05-21|Antimony Ingot 99.65%min EXW China(5000)  05-21|Antimony Ingot 99.85%min EXW China(5000)  05-21|Antimony Trioxide 99.5%min Delivered China(4000)  05-21|Antimony Trioxide 99.5%min FOB China(500)  05-21|Antimony Ingot 99.65%min In warehouse Rotterdam(500)  05-21|Mercury Metal 99.9%min Ex-VAT EXW China(35)  05-21|PrNd Mischmetal Pr 25%, Nd 75% FOB China(-2)  05-21|Indium Ingot 99.995%min Delivered US(8)  05-21|Antimony Ingot 99.65%min FOB China(500)  05-21|Mercury Metal 99.999%min Ex-VAT EXW China(35)  05-21|Indium Ingot 99.995%min Delivered Europe(8)  05-21|Zinc Conc. TC 50% CIF China(-1.1)  05-21
  • Jinpeng Group's new energy power battery package project settles in Huaibei, Anhui

    2022-04-19 15:47:21   [Print]
    The signing ceremony of Jinpeng Group's new energy power battery package project was held in Huaibei, Anhui province on April 16.Asian Metal Copyright In detail, the phase one project with an investment of RMB2 billion USD313.Asian Metal Copyright With a total investment of RMB5 billion (USD784.Asian Metal Copyright8 million will build NEV Li-ion battery power system, BMS system, related core components and other manufacturing bases.Asian Metal Copyright5 million), the project will be constructed by two phases.Asian Metal Copyright In detail, the phase one project with an investment of RMB2 billion USD313.Asian Metal Copyright In detail, the phase one project with an investment of RMB2 billion (USD313.Asian Metal Copyright In detail, the phase one project with an investment of RMB2 billion USD313.Asian Metal Copyright8 million) will build NEV Li-ion battery power system, BMS system, related core components and other manufacturing bases.Asian Metal Copyright7 million, the phase two project will be used for research and development and output capacity upgradation.Asian Metal Copyright With an investment of RMB3 billion (USD470.Asian Metal Copyright7 million, the phase two project will be used for research and development and output capacity upgradation.Asian Metal Copyright7 million), the phase two project will be used for research and development and output capacity upgradation.
    .Asian Metal Copyright7 million, the phase two project will be used for research and development and output capacity upgradationAsian Metal Copyright
    Cobalt Chloride 24%min Delivered China
    Unit:RMB/mt
    China cobalt carbonate producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.