• Copper Cathode 99.99%min Delivered Chinadown(-3140)  02-05|Tungsten Ore WO3 50%min FOB Africaup(30)  02-05|Tungsten Scrap Grinding Swarf W 70%min, Co 5%min Ex-VAT Delivered Chinaup(300)  02-05|Copper Conc. 20%min Delivered Chinadown(-3000)  02-05|Ferro-vanadium 80%min In warehouse Pittsburghup(0.9)  02-05|Spodumene Li2O 6%min CIF Chinadown(-60)  02-05|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(35)  02-05|Lanthanum Oxide 99.999%min EXW Chinaup(800)  02-05|Lithium Carbonate 99.2%min Delivered Chinadown(-4000)  02-05|Ferro-tungsten 75%min EXW Chinaup(25000)  02-05|Spodumene Li2O 3%min In port Chinadown(-60)  02-05|Bismuth Ingot 99.99%min Delivered Indiaup(50)  02-05|Cobalt Metal 99.8%min Delivered Chinadown(-12)  02-05|Tantalum Metal 99.95%min EXW Chinaup(100)  02-05
  • Sichuan: Output proportion of coal mines with quality production capacity to reach over 50% by 2025

    2022-03-11 11:56:12   [Print]
    According to the 14th Five-Year Energy Development Plan in Sichuan issued by the provincial government recently, the local output proportion of coal mines with quality production capacity will reach over 50% by 2025.Asian Metal CopyrightAccording to the 14th Five-Year Energy Development Plan in Sichuan issued by the provincial government recently, the local output proportion of coal mines with quality production capacity will reach over 50% by 2025.Asian Metal Copyright By 2025, Sichuan will finish building coal reserve bases in eastern Sichuan, southern Sichuan and northern Sichuan with a total static reserve capacity of more than 4.Asian Metal Copyright .Asian Metal Copyright5 million tons.
    .Asian Metal Copyright5 million tonsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.