• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Zinc Conc. TC 50% CIF China(-1.5)  04-30
  • Shuangliang Eco-Energy to invest RMB6.2 billion in building Baotou 40GW monocrystalline silicon phase II project

    2022-02-07 11:57:44   [Print]
    Shuangliang Eco-Energy announced on January 28 that the company plans to invest in the construction of a 40GW monocrystalline silicon project in the Rare Earth High-tech Zone.Asian Metal CopyrightShuangliang Eco-Energy announced on January 28 that the company plans to invest in the construction of a 40GW monocrystalline silicon project in the Rare Earth High-tech Zone.Asian Metal Copyright The project will be implemented in two phases, and the first phase of the 20GW monocrystalline silicon project is nearly completed.Asian Metal Copyright, Ltd.Asian Metal Copyright Now the company plans to sign the "Cooperation Agreement on Baotou 40GW Monocrystalline Silicon Phase II Project (20GW) of Shuangliang Eco-Energy System Co.Asian Metal Copyright2 billion USD975 million.Asian Metal Copyright, Ltd.Asian Metal Copyright2 billion USD975 million.Asian Metal Copyright" with Baotou Rare Earth High-tech Zone, and will start the investment and construction plan for the second phase project (20GW) with a total investment of RMB6.Asian Metal Copyright2 billion USD975 million.Asian Metal Copyright2 billion (USD975 million).Asian Metal Copyright The construction period of the second phase project is two years, and the main body of investment and operation is still the local project company Shuangliang Silicon Materials Baotou Co.Asian Metal Copyright The construction period of the second phase project is two years, and the main body of investment and operation is still the local project company Shuangliang Silicon Materials (Baotou) Co.Asian Metal Copyright2 billion USD975 million.Asian Metal Copyright, Ltd.
    .Asian Metal CopyrightShuangliang Eco-Energy announced on January 28 that the company plans to invest in the construction of a 40GW monocrystalline silicon project in the Rare Earth High-tech ZoneAsian Metal Copyright
    Silicon Metal 2-2-02 FOB China
    Unit:USD/mt
    China silicon metal producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.