• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • LB Group to invest in 150ktpa electronic grade LFP project

    2022-01-18 17:44:39   [Print]
    LB Group announced on January 17 that its holding subsidiary Wanrun New Energy plans to build the 150ktpa electronic grade LFP project with total investment of RMB2 billion (USD315 million).Asian Metal Copyright In addition, Xiangyang Lomon Titanium Industry, a wholly-owned subsidiary of LB Group, plans to invest RMB1 billion USD158 million in building the 200ktpa titanium dioxide post-processing project.Asian Metal Copyright In addition, Xiangyang Lomon Titanium Industry, a wholly-owned subsidiary of LB Group, plans to invest RMB1 billion (USD158 million) in building the 200ktpa titanium dioxide post-processing project.Asian Metal Copyright66 million.Asian Metal Copyright The company's holding subsidiary Yunnan Guotai Metal also announced its plan to build the 10ktpa titanium sponge production line upgrade project, with total investment estimated at RMB442 million (USD69.Asian Metal CopyrightLB Group announced on January 17 that its holding subsidiary Wanrun New Energy plans to build the 150ktpa electronic grade LFP project with total investment of RMB2 billion USD315 million.Asian Metal Copyright66 million).
    .Asian Metal Copyright In addition, Xiangyang Lomon Titanium Industry, a wholly-owned subsidiary of LB Group, plans to invest RMB1 billion USD158 million in building the 200ktpa titanium dioxide post-processing projectAsian Metal Copyright
    Lithium Iron Phosphate Li 3.9%min Delivered China
    Unit:RMB/mt
    China lithium nickel cobalt manganese oxide producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.