• Manganese Ore S.A. 36%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 36%min In Tianjin Port(2)  04-26|Manganese Ore S.A. 37%min In Qinzhou Port(2)  04-26|Manganese Ore S.A. 37%min In Tianjin Port(2)  04-26|Manganese Ore Brazilian 44%min In Qinzhou Port(2.1)  04-26|Manganese Ore Brazilian 44%min In Tianjin Port(2.1)  04-26|Manganese Ore Gabonese 44%min In Qinzhou Port(1.9)  04-26|Manganese Ore Gabonese 44%min In Tianjin Port(1.9)  04-26|Manganese Ore Australian 45%min In Qinzhou Port(1.8)  04-26|Manganese Ore Australian 45%min In Tianjin Port(1.8)  04-26|Silicon Metal 98.5%min Delivered US(0.04)  04-26|Copper Conc. TC 25%min CIF China(-1)  04-26|Ferro-silicon 75%min In warehouse Pittsburgh(0.03)  04-26|Zinc Conc. TC 50% CIF China(-1.5)  04-26
  • Jiangsu Delong Langnuode stainless steel pipe project started

    2022-01-11 12:01:42   [Print]
    On January 8, Langnuode stainless steel pipe project with a total investment of about 5.Asian Metal Copyright The project is jointly invested and constructed by Jiangsu Delong Nickel Industry Co.Asian Metal Copyright6 billion yuan (879 million US dollars) was started.Asian Metal Copyright, Ltd.Asian Metal Copyright The project is jointly invested and constructed by Jiangsu Delong Nickel Industry Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright The project is jointly invested and constructed by Jiangsu Delong Nickel Industry Co.Asian Metal Copyright and Jiawang Chenglv Group with a designed capacity of 400,000tpy of stainless steel capillary and 400,000tpy of finished stainless steel capillary.

    .Asian Metal Copyright and Jiawang Chenglv Group with a designed capacity of 400,000tpy of stainless steel capillary and 400,000tpy of finished stainless steel capillaryAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.