• Ferro-manganese Mn 65%min, C 7%max EXW China(200)  04-30|Ferro-manganese Mn 75%min, C 8%max EXW China(200)  04-30|Silico-manganese 65/17 EXW China(200)  04-30|Copper Conc. TC 25%min CIF China(-1)  04-30|Zinc Conc. 50%min EXW North China(480)  04-30|Ferro-silicon 75%min EXW China(200)  04-30|Zinc Conc. 50%min EXW South China(480)  04-30|Selenium Powder 99.9%min Delivered India(50)  04-30|Ferro-chrome Cr 60%min, C 8%max In warehouse Pittsburg(-0.05)  04-30|Zinc Ingot 99.99%min EXW China (600)  04-30|Zinc Ingot 99.995%min In warehouse Shanghai(600)  04-30|Zinc Ingot 99.995%min In warehouse Tianjin(600)  04-30|Zinc Ingot 99.995%min In warehouse Guangzhou(600)  04-30|Ferro-manganese Mn 75%min, C 2%max EXW China(200)  04-30
  • Xinyu Iron & Steel issues production capacity replacement plan related to electric arc furnaces

    2021-12-27 12:03:23   [Print]
    In accordance with the requirements of the Guiding Opinions of the State Council on Resolving the Contradictions of Serious Overcapacity, Opinions of the State Council on Resolving Excessive Capacity of the Iron and Steel Industry and Realizing Development amid Hardships and the Implementation Measures for Capacity Replacement in the Iron and Steel Industry, Xinyu Iron & Steel issued its production capacity replacement plan for electric arc furnace energy saving and environmental protection upgrading project.

    According to the plan, Xinyu Iron & Steel will build an electric furnace representing 1 million tons of steelmaking production capacity per year from January 2022 and the furnace will go into operation in December 2024. In addition, the company will start to dismantle two electric furnaces, which totally represent 1 million tons of steelmaking production capacity per year, three months before the above new furnace is put into operation.


    .Asian Metal Copyright Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.