• NCM 523 Delivered Chinaup(2600)  10-22|Cobalt Tetroxide 73.5%min Delivered Chinaup(9)  10-22|LNCMO 613 PC Delivered Chinaup(4)  10-22|NCM 8312 Delivered Chinaup(2900)  10-22|NdFeB Sintered Rough N35 Block EXW Chinadown(-4)  10-22|NCM 613 Delivered Chinaup(2400)  10-22|Praseodymium Oxide 99.5%min In warehouse Rotterdamup(2)  10-22|LNCMO 523 PC Delivered Chinaup(4)  10-22|Spodumene Li2O 5%min In port Chinaup(30)  10-22|Neodymium Metal 99%min EXW Chinadown(-20000)  10-22|Lithium Cobaltate Co 60%min Delivered Chinaup(9)  10-22|Cobalt Oxide 72%min In warehouse Rotterdamup(0.8)  10-22|LNCMO 523 SC Delivered Chinaup(4)  10-22|Erbium Oxide 99.5%min In warehouse Rotterdamup(1.5)  10-22
  • Power China signs contract for Colombia's Tukuna 238MW photovoltaic project group

    2021-11-23 15:17:22   [Print]
    On November 19, Power China and Tukuna Photovoltaic Project Company signed an EPC contract for the 238MW photovoltaic project group in Tukuna, Colombia.

    It is understood that the Tukuna photovoltaic project consists of 12 19.9MW photovoltaic projects with a total installed capacity of 238MW.

    .Asian Metal Copyright Asian Metal Copyright
    Polysilicon 9N Delivered China
    Unit:RMB/kg
    Polysilicon 9N Delivered China RMB/kg
    China silicon metal producers' sales to production ratio statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.