• Lithium Hydroxide Monohydrate LiOH 56.5%min Delivered China(17000)  01-28|Lithium Hydroxide Monohydrate LiOH 56.5%min, Magnets 0.0001%max Delivered China(17000)  01-28|Lithium Carbonate 99.5%min Delivered EU(1.5)  01-28|Lithium Carbonate 99.5%min CIF China(1.4)  01-28|Lithium Carbonate 99.5%min Delivered US(1.5)  01-28|Lithium Carbonate 99.5%min FOB South America(1.3)  01-28|Yttrium Oxide 99.999%min FOB China(0.4)  01-28|Yttrium Metal 99.9%min EXW China(8)  01-28|Lithium Hydroxide Monohydrate LiOH 56.5%min, Magnets 0.0001%max FOB China(1.2)  01-28|Bismuth Ingot 99.99%min Delivered US(0.1)  01-28|Lithium Chloride 99.3%min Delivered China(8000)  01-28|Lithium Hydroxide Monohydrate LiOH 56.5%min, Magnets 0.0001%max Delivered South Korea(1.2)  01-28|Ferro-manganese Mn 75%min, C 2%max EXW China(300)  01-28|Lithium Carbonate 99%min Delivered China(10000)  01-28
  • Sunstone Yunnan Aluminum to put 900,000tpy carbon project phase II into operation in H2 2022

    2021-11-03 12:01:09   【Print】
    On November 2, Sunstone Development said on the investor interaction platform that the company focuses on R&D, production and sales of green energy-saving prebaked anode products with low consumption and high current density, and has done a lot of work in the production of prebaked anode.Asian Metal Copyright The second phase 300,000tpy of the 900,000tpy carbon project of Sunstone Yunnan Aluminum has started construction and is expected to be put into operation in the second half of next year.Asian Metal Copyright The second phase (300,000tpy) of the 900,000tpy carbon project of Sunstone Yunnan Aluminum has started construction and is expected to be put into operation in the second half of next year.
    .Asian Metal Copyright The second phase 300,000tpy of the 900,000tpy carbon project of Sunstone Yunnan Aluminum has started construction and is expected to be put into operation in the second half of next year.Asian Metal Copyright
      Copyright © Asian Metal Corp. All rights reserved.