• Copper Conc. TC 25%min CIF Chinadown(-3)  07-04|Chrome Lump S.A. 38%min CIF Chinadown(-7)  07-04|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-50)  07-04|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-50)  07-04|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-100)  07-04|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(8)  07-04|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-04|Selenium Powder 99.9%min Delivered Indiaup(50)  07-04|Chrome Lump S.A. 38%min In port Chinadown(-1)  07-04|Silico-manganese 60/14 EXW Chinaup(100)  07-04|Silico-manganese 65/17 EXW Chinaup(100)  07-04|Rebar HRB400 20mm In warehouse Guangzhouup(50)  07-04|Flake Graphite +195 EXW Chinadown(-100)  07-04|Ferro-silicon 75%min In warehouse Rotterdamdown(-20)  07-04
  • LB Group to build comprehensive recycling demonstration project of titanium dioxide and other products

    2021-10-26 17:30:12   [Print]
    LB Group announced that its wholly-owned subsidiary, Sichuan Lomon Mining and Metallurgy Co.Asian Metal Copyright The total investment of the project is 350,000 million yuan 54,845 million US dollars, and the construction period is 4 years and 6 months.Asian Metal Copyright, Ltd.Asian Metal CopyrightLB Group announced that its wholly-owned subsidiary, Sichuan Lomon Mining and Metallurgy Co.Asian Metal Copyright, plans to invest in the construction of a comprehensive recovery demonstration project of titanium dioxide by chlorination process, vanadium, scandium and other rare metals (with 1 million tons of high-salt wastewater treatment project).Asian Metal Copyright, plans to invest in the construction of a comprehensive recovery demonstration project of titanium dioxide by chlorination process, vanadium, scandium and other rare metals with 1 million tons of high-salt wastewater treatment project.Asian Metal Copyright The project would produce 200,000 tons of high-grade titanium dioxide by chlorination process, 43,000 tons of hydrochloric acid, 100,000 tons of caustic soda, 400 tons of vanadium pentoxide and 20 tons of scandium oxide annually.Asian Metal Copyright .Asian Metal Copyright The total investment of the project is 350,000 million yuan (54,845 million US dollars), and the construction period is 4 years and 6 months.

    .Asian Metal Copyright The project would produce 200,000 tons of high-grade titanium dioxide by chlorination process, 43,000 tons of hydrochloric acid, 100,000 tons of caustic soda, 400 tons of vanadium pentoxide and 20 tons of scandium oxide annuallyAsian Metal Copyright
    Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered China
    Unit:RMB/mt
    Titanium Dioxide R TiO2 93%min, Si/Zr Coating Delivered China RMB/mt
    China titanium dioxide producers' output statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.