• Tungsten APT 88.5%min IW Rotterdamup(70)  04-09|Manganese Ore S.A. 36%min In Qinzhou Portdown(-1)  04-09|Manganese Ore S.A. 37%min In Qinzhou Portdown(-1)  04-09|Cerium Oxide 99%min FOB Chinaup(50)  04-09|Ferro-gadolinium 73% EXW Chinaup(5000)  04-09|Manganese Ore S.A. 36%min In Tianjin Portdown(-1)  04-09|Titanium Dioxide Rutile, 93%min FOB Chinaup(50)  04-09|Manganese Ore S.A. 37%min In Tianjin Portdown(-1)  04-09|Gadolinium Oxide 99.5%min EXW Chinaup(5000)  04-09|Rebar BS4449 GR500 16mm IW Kuala Lumpurup(50)  04-09|Wire Rod SAE1008 5.5mm IW Kuala Lumpurup(50)  04-09|HR Coil SS400 3.0mm IW Kuala Lumpurup(50)  04-09|Ilmenite Conc 52%min CIF Chinadown(-5)  04-09|Lanthanum Chloride 99.9%min EXW Chinaup(50)  04-09
  • LB Group to build comprehensive recycling demonstration project of titanium dioxide and other products

    2021-10-26 17:30:12   [Print]
    LB Group announced that its wholly-owned subsidiary, Sichuan Lomon Mining and Metallurgy Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal CopyrightLB Group announced that its wholly-owned subsidiary, Sichuan Lomon Mining and Metallurgy Co.Asian Metal Copyright, plans to invest in the construction of a comprehensive recovery demonstration project of titanium dioxide by chlorination process, vanadium, scandium and other rare metals (with 1 million tons of high-salt wastewater treatment project).Asian Metal Copyright The total investment of the project is 350,000 million yuan 54,845 million US dollars, and the construction period is 4 years and 6 months.Asian Metal Copyright The project would produce 200,000 tons of high-grade titanium dioxide by chlorination process, 43,000 tons of hydrochloric acid, 100,000 tons of caustic soda, 400 tons of vanadium pentoxide and 20 tons of scandium oxide annually.Asian Metal Copyright The project would produce 200,000 tons of high-grade titanium dioxide by chlorination process, 43,000 tons of hydrochloric acid, 100,000 tons of caustic soda, 400 tons of vanadium pentoxide and 20 tons of scandium oxide annually.Asian Metal Copyright The total investment of the project is 350,000 million yuan (54,845 million US dollars), and the construction period is 4 years and 6 months.

    .Asian Metal Copyright, plans to invest in the construction of a comprehensive recovery demonstration project of titanium dioxide by chlorination process, vanadium, scandium and other rare metals with 1 million tons of high-salt wastewater treatment projectAsian Metal Copyright
    Titanium Dioxide Rutile, 93%min FOB China
    Unit:USD/mt
    Titanium Dioxide Rutile, 93%min FOB China USD/mt
    China titanium dioxide producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.