• Ferro-molybdenum 65%min In warehouse USup(2.2)  02-09|Spodumene Li2O 6%min CIF Chinadown(-60)  02-09|Bastnaesite TREO 70%min EXW Chinaup(1300)  02-09|Cobalt Metal 99.8%min Delivered Chinaup(12)  02-09|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(22000)  02-09|Ferro-vanadium 50%min In warehouse Russiaup(28)  02-09|Vanadium Pentoxide Powder 99.5%min EXW Chinaup(2800)  02-09|Spodumene Li2O 3%min In port Chinadown(-60)  02-09|NdFeB Sintered Rough N35 Block EXW Chinaup(5)  02-09|Ferro-molybdenum 60%min In port South Koreaup(1.7)  02-09|Ferro-molybdenum 65%min In warehouse Rotterdamup(1.7)  02-09|Neodymium Oxide 99.5%min EXW Chinaup(23000)  02-09|Tin Solder Wire Sn 99%min, Ag 0.3%min, Cu 0.7%max EXW Chinadown(-13)  02-09|Praseodymium Oxide 99.5%min EXW Chinaup(23000)  02-09
  • LB Group to build comprehensive recycling demonstration project of titanium dioxide and other products

    2021-10-26 17:30:12   [Print]
    LB Group announced that its wholly-owned subsidiary, Sichuan Lomon Mining and Metallurgy Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal CopyrightLB Group announced that its wholly-owned subsidiary, Sichuan Lomon Mining and Metallurgy Co.Asian Metal Copyright, plans to invest in the construction of a comprehensive recovery demonstration project of titanium dioxide by chlorination process, vanadium, scandium and other rare metals (with 1 million tons of high-salt wastewater treatment project).Asian Metal Copyright, plans to invest in the construction of a comprehensive recovery demonstration project of titanium dioxide by chlorination process, vanadium, scandium and other rare metals with 1 million tons of high-salt wastewater treatment project.Asian Metal Copyright The project would produce 200,000 tons of high-grade titanium dioxide by chlorination process, 43,000 tons of hydrochloric acid, 100,000 tons of caustic soda, 400 tons of vanadium pentoxide and 20 tons of scandium oxide annually.Asian Metal Copyright .Asian Metal Copyright The total investment of the project is 350,000 million yuan (54,845 million US dollars), and the construction period is 4 years and 6 months.

    .Asian Metal CopyrightLB Group announced that its wholly-owned subsidiary, Sichuan Lomon Mining and Metallurgy CoAsian Metal Copyright
    Titanium Dioxide Rutile, 93%min, Si/Zr Coating Delivered China
    Unit:RMB/mt
    Titanium Dioxide Rutile, 93%min, Si/Zr Coating Delivered China RMB/mt
    China titanium dioxide producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.