• Copper Conc. TC 25%min CIF Chinadown(-3)  07-11|Polysilicon 9N Delivered Chinaup(2)  07-11|Silicon Metal 4-4-1 Delivered Chinaup(300)  07-11|Silicon Metal 4-2-1 Delivered Chinaup(300)  07-11|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(10)  07-11|Erbium Oxide 99.5%min EXW Chinaup(9)  07-11|Antimony Ingot 99.65%min In port Indiaup(140)  07-11|Ferro-silicon 75%min In warehouse Pittsburghdown(-0.03)  07-11|Iron Ore Fine Australian 62%min In port Chinaup(20)  07-11|Dysprosium Oxide 99.5%min EXW Chinaup(45)  07-11|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinaup(10)  07-11|Iron Ore Fine Australian 62%min CNF Chinaup(2.5)  07-11|Iron Ore Fine Brazilian 65%min In port Chinaup(20)  07-11|Rhenium APR 99.99%min EXW Chinaup(200)  07-11
  • Valin LY Steel to build product structure adjustment and upgrading project

    2021-10-26 12:04:20   [Print]
    Valin Steel announced that its wholly-owned subsidiary, Valin LY Steel, will build a product structure adjustment and upgrading project oriented to advanced steel materials with a total investment of about RMB2.Asian Metal Copyright .Asian Metal Copyright26 billion (USD353.Asian Metal Copyright92 million and the construction period will be 13 months.Asian Metal Copyright92 million) and a total construction period of 15 months.Asian Metal Copyright26 billion USD353.Asian Metal Copyright The project won't involve newly-added production capacity.Asian Metal Copyright2 billion USD187.Asian Metal Copyright In addition, Valin LY Steel will implement a coke oven environmental protection upgrading and rectification project, of which the investment will be RMB1.Asian Metal Copyright92 million and a total construction period of 15 months.Asian Metal Copyright2 billion (USD187.Asian Metal Copyright In addition, Valin LY Steel will implement a coke oven environmental protection upgrading and rectification project, of which the investment will be RMB1.Asian Metal Copyright92 million) and the construction period will be 13 months.
    .Asian Metal Copyright92 million and the construction period will be 13 monthsAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.