• Iron Ore Fine Australian 62%min In port China(20)  12-08|Lithium Carbonate 99.5%min Delivered EU(0.9)  12-08|Lithium Carbonate 99.5%min Delivered China(6000)  12-08|Iron Ore Fine Australian 62%min CNF China(3)  12-08|Lithium Carbonate 99.5%min Delivered US(0.9)  12-08|Cobalt Powder 99.5%min Delivered China(15)  12-08|Iron Ore Fine Australian 58% In port China(15)  12-08|Ferro-silicon 75%min In warehouse Rotterdam(-100)  12-08|Iron Ore Lump Australian 62%min In port China(23)  12-08|Zirconium Carbonate Zr(Hf)O2 40%min EXW China(-900)  12-08|Lithium Carbonate 99.5%min CIF China(0.8)  12-08|Lanthanum Oxide 99.999%min EXW China(800)  12-08|Ferro-silicon 70%min EXW India(4000)  12-08|Pet Coke S 3%max EXW China(50)  12-08
  • Valin LY Steel to build product structure adjustment and upgrading project

    2021-10-26 12:04:20   【Print】
    Valin Steel announced that its wholly-owned subsidiary, Valin LY Steel, will build a product structure adjustment and upgrading project oriented to advanced steel materials with a total investment of about RMB2.Asian Metal Copyright In addition, Valin LY Steel will implement a coke oven environmental protection upgrading and rectification project, of which the investment will be RMB1.Asian Metal Copyright26 billion (USD353.Asian Metal Copyright92 million and the construction period will be 13 months.Asian Metal Copyright92 million) and a total construction period of 15 months.Asian Metal Copyright In addition, Valin LY Steel will implement a coke oven environmental protection upgrading and rectification project, of which the investment will be RMB1.Asian Metal Copyright The project won't involve newly-added production capacity.Asian Metal Copyright92 million and a total construction period of 15 months.Asian Metal Copyright In addition, Valin LY Steel will implement a coke oven environmental protection upgrading and rectification project, of which the investment will be RMB1.Asian Metal Copyright The project won't involve newly-added production capacity.Asian Metal Copyright2 billion (USD187.Asian Metal Copyright .Asian Metal Copyright92 million) and the construction period will be 13 months.
    .Asian Metal Copyright26 billion USD353.Asian Metal Copyright
      Copyright © Asian Metal Corp. All rights reserved.