• Zinc Conc. TC 50%min CIF Chinadown(-5)  11-26|Yttrium Oxide 99.999%min In warehouse Rotterdamup(5)  11-26|Yttrium Oxide 99.999%min FOB Chinaup(0.5)  11-26|Erbium Oxide 99.5%min In warehouse Rotterdamup(2)  11-26|Terbium Oxide 99.99%min In Warehouse Rotterdamup(120)  11-26|Zinc Conc. 50%min EXW Chinaup(500)  11-26|Antimony Ingot 99.65%min In warehouse Rotterdamdown(-1100)  11-26|Spodumene Li2O 6%min CIF Chinaup(30)  11-26|Gadolinium Oxide 99.99%min In Warehouse Baltimoreup(5)  11-26|Dysprosium Oxide 99.5%min In Warehouse Rotterdamup(25)  11-26|Neodymium Metal 99%min FOB Chinadown(-2.5)  11-26|Lithium Carbonate 99.2%min Delivered Chinaup(2000)  11-26|Lithium Carbonate 99.5%min Delivered Chinaup(2000)  11-26|Silicon Metal 98.5%min Delivered USdown(-0.03)  11-26
  • Valin LY Steel to build product structure adjustment and upgrading project

    2021-10-26 12:04:20   [Print]
    Valin Steel announced that its wholly-owned subsidiary, Valin LY Steel, will build a product structure adjustment and upgrading project oriented to advanced steel materials with a total investment of about RMB2.Asian Metal Copyright2 billion USD187.Asian Metal Copyright26 billion (USD353.Asian Metal Copyright2 billion USD187.Asian Metal Copyright92 million) and a total construction period of 15 months.Asian Metal CopyrightValin Steel announced that its wholly-owned subsidiary, Valin LY Steel, will build a product structure adjustment and upgrading project oriented to advanced steel materials with a total investment of about RMB2.Asian Metal Copyright The project won't involve newly-added production capacity.Asian Metal Copyright .Asian Metal Copyright In addition, Valin LY Steel will implement a coke oven environmental protection upgrading and rectification project, of which the investment will be RMB1.Asian Metal Copyright The project won't involve newly-added production capacity.Asian Metal Copyright2 billion (USD187.Asian Metal Copyright92 million and the construction period will be 13 months.Asian Metal Copyright92 million) and the construction period will be 13 months.
    .Asian Metal Copyright In addition, Valin LY Steel will implement a coke oven environmental protection upgrading and rectification project, of which the investment will be RMB1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.