• Manganese Ore Gabonese 44%min In Tianjin Port(1.5)  04-19|Manganese Ore Gabonese 44%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Qinzhou Port(1.5)  04-19|Manganese Ore Australian 45%min In Tianjin Port(1.5)  04-19|Manganese Ore Brazilian 44%min In Tianjin Port(1.5)  04-19|Ferro-chrome Cr 60%min, C 0.1%max In warehouse Rotterdam(-0.1)  04-19|Manganese Ore S.A. 36%min In Tianjin Port(1.3)  04-19|Manganese Ore Brazilian 44%min In Qinzhou Port(1.3)  04-19|Manganese Sulfate Mn 32%min EXW China(150)  04-19|Copper Conc. 20%min Delivered China(2150)  04-19|Manganese Ore S.A. 36%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Qinzhou Port(1)  04-19|Manganese Ore S.A. 37%min In Tianjin Port(1)  04-19|Indium Ingot 99.995%min EXW China(60)  04-19
  • Valin LY Steel to build product structure adjustment and upgrading project

    2021-10-26 12:04:20   [Print]
    Valin Steel announced that its wholly-owned subsidiary, Valin LY Steel, will build a product structure adjustment and upgrading project oriented to advanced steel materials with a total investment of about RMB2.Asian Metal Copyright92 million and a total construction period of 15 months.Asian Metal Copyright26 billion (USD353.Asian Metal Copyright The project won't involve newly-added production capacity.Asian Metal Copyright92 million) and a total construction period of 15 months.Asian Metal Copyright92 million and the construction period will be 13 months.Asian Metal Copyright The project won't involve newly-added production capacity.Asian Metal Copyright92 million and the construction period will be 13 months.Asian Metal Copyright In addition, Valin LY Steel will implement a coke oven environmental protection upgrading and rectification project, of which the investment will be RMB1.Asian Metal CopyrightValin Steel announced that its wholly-owned subsidiary, Valin LY Steel, will build a product structure adjustment and upgrading project oriented to advanced steel materials with a total investment of about RMB2.Asian Metal Copyright2 billion (USD187.Asian Metal Copyright92 million and a total construction period of 15 months.Asian Metal Copyright92 million) and the construction period will be 13 months.
    .Asian Metal Copyright2 billion USD187Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.